Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹9.8 LRejected-Finance | ₹9.8 L | L2 | Rejected-Finance ABOVE RATE QUOTED |
| Sl No | Description | Qty | Unit | Kannan Construction L2 | GAJENDIRA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Construction Of Culvert In Supply Channel At Mutharsampoondi Panchayat. | |||||
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 84 | Cu.m | 512 ₹43,008 | 212.5 ₹17,850 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 16.8 | Cu.m | 4,895 ₹82,236 | 4,895 ₹82,236 |
| 1.03Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. | |||||
| 1.04 | BELOW GROUND LEVEL | 128.08 | Cu.m | 455 ₹58,276.40 | 455 ₹58,276.40 |
| 1.05 | ABOVE GROUND LEVEL | 49.75 | Cu.m | 975 ₹48,506.25 | 925 ₹46,018.75 |
| 1.06 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 77.83 | Cu.m | 5,230 ₹4.1 L | 5,230 ₹4.1 L |
| 1.07 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 5.38 | Cu.m | 6,260 ₹33,678.80 | 6,260 ₹33,678.80 |
| 1.08 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works. | 0.78 | Cu.m | 87,400 ₹67,822.40 | 87,400 ₹67,822.40 |
| 1.09 | Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 10.93 | Cu.m | 8,355 ₹91,320.15 | 8,355 ₹91,320.15 |
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
31 May 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT) THURINJAPURAM
BLOCK DEVELOPMENT OFFICE THURINJAPURAM
CONSTRUCTION OF CULVERT IN SUPPLY CHANNEL AT MUTHARASAMPOONDI PANCHAYAT THURINJAPURAM BLOCK UNDER SFC(D.PT) 2023-2024
2023_RDTN_317392_1
RocNoA2_288_2023DT12.05.2023
Open Tender
Civil Works
180 days
THURINJAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,900
25 Mar 2026
20 May 2023
31 May 2023
20 May 2023
31 May 2023
20 May 2023
Amount
Construction Of Culvert In Supply Channel At Mutharsampoondi Panchayat.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
BELOW GROUND LEVEL
ABOVE GROUND LEVEL
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kannan Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
TENDER_DOCUMENT.pdf
Tender Documents • 1.07 MB
BOQ_376673.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid