Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC NOT AVAILABLE | ₹5.9 L | L1 | Accepted-AOC Lowest I |
| 2 | L2₹6.0 LRejected-Finance HARDAHA BALUWA VARANASI CHANDAULE | ₹6.0 L | L2 | Rejected-Finance Lowest II |
| 3 | L3₹7.1 LRejected-Finance TATARPUR LALU A 2 ADESH NAGAR NAJIBABAD BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹7.1 L | L3 | Rejected-Finance Lowest III |
| 4 | Rejected-Technical | - | - | Rejected-Technical There is no experience of similar nature. |
| 5 | Rejected-Technical | - | - | Rejected-Technical ID form no. 112 is not attached, UP Electronics certificate is not attached. |
| Sl No | Description | Qty | Unit | M/S SHIV CONSTRUCTION L2 | ATUL KUMAR GUPTA L3 | S S CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in ordinary soil including lift upto1.50M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete. | 37 | Cum | 50 ₹1,850 | 52 ₹1,924 | 44.55 ₹1,648.35 |
| 2.00 | Laying C.C 1:3:6 with cementm Coarse sand and crushed Stone ballast 4mm to 20 & 20 mm to 40 (graded), size mortar in foundation including cost of all material, labour, T&P etc. | 21 | Cum | 4,050 ₹85,050 | 5,300 ₹1.1 L | 4,416.93 ₹92,755.53 |
| 3.00 | Brick work in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. | 48 | Cum | 4,700 ₹2.3 L | 5,300 ₹2.5 L | 4,360.23 ₹2.1 L |
| 4.00 | Ordinary Centering & shuttering of Plywood or steel for RCC Work | 42 | Sqm | 650 ₹27,300 | 800 ₹33,600 | 665.82 ₹27,964.44 |
| 5.00 | Laying C.C 1:1.5:3 using size 4-10 mm & 10-20mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work | 7.5 | Cum | 4,750 ₹35,625 | 6,300 ₹47,250 | 5,345.19 ₹40,088.93 |
| 6.00 | Laying C.C 1:1.5:3 using size 4-10 mm & 10-20mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work | 1.5 | Cum | 4,750 ₹7,125 | 6,300 ₹9,450 | 5,345.19 ₹8,017.79 |
| 7.00 | Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.(As per IRC:: SP:20-2002 plate No. 7.09) | 0.3 | MT | 79,000 ₹23,700 | 79,000 ₹23,700 | 64,139.04 ₹19,241.71 |
| 8.00 | Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM) | 302 | Sqm | 100 ₹30,200 | 115 ₹34,730 | 95.58 ₹28,865.16 |
| 9.00 | S/F 60 cm. long 100 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 2.4 | RM | 145 ₹348 | 145 ₹348 | 117.45 ₹281.88 |
| 10.00 | Earth work in fiiling for Making ramp including all cost of T&P material required for proper completion of work as directed by Engineer-in -charge. | 125 | Cum | 170 ₹21,250 | 200 ₹25,000 | 165.24 ₹20,655 |
Tender Value
₹7.3 L
EMD Value
₹15,000
Closing Date
4 Nov 2025, 2:00 pmClosed
Executive Engineer
EGCCD6 Najibabad
Construction of V.R.B. at Km 4.750 of Bundki Minor
2025_UPIDC_1085704_19
03/EE/2025-26
Open Tender
Civil Works - Canal
90 days
Najibabad
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹15,000
17 Feb 2026
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
28 Oct 2025 - 4 Nov 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
t3.pdf
Tender Documents • 1.40 MB
BOQ_1991059.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid