Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.2 Cr
EMD Value
₹6.3 L
Closing Date
11 Nov 2024, 10:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Directorate of Municipal Administration
PURUSHOTTAM
Construction of Commercial Complex Old Vegetable Market in Kalaburagi City
DMA/2024-25/BD/WORK_INDENT29740
DMA/2024-25/BD/WORK_INDENT29740
Open
Buildings
Two Tender Document System(Two Cover)
DMA City Corporation Kalaburagi
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Satisfactory completed, at least one similar Construction of Building of value not less than Rs. 250.00 Lakhs as prime contractor
To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24.
Achieved in at least two financial years a minimum annual financial turnover of Rs. 1000.00 Lakhs.
Liquid assets and or availability of credit facilities of no less than Rs. 125.00 Lakhs (Unconditional Credit lines/ letters of credit/ certificates from banks for meeting the fund requirement etc).
₹5,000
₹6.3 L
10 Oct 2024
10 Oct 2024
12 Nov 2024
8 Nov 2024
30 Oct 2024
Construction of Commercial Complex Old Vegetable Market in Kalaburagi City
Earth work in surface excavation by mechanical means for lowering and leveling the ground without blasting for all works other than foundation in Ordinary/Soft rock and depth not exceeding 300mm as pe...
Earth work excavation for Foundation by mechanical means for all works and depth upto 3 m, as per drawing and technical cifications, including setting out, shoring, strutting, barricading, caution i...
KSRB 2.2.6 : Excavation for foundation of buildings, water supply and sanitary lines andelectrical conduits etc., either in pits or in trenches 1,50m . and above in width in hard rock by chiselling an...
Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, to...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.5...
Adding 8 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Adding 70 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Providing and laying in Reinforced cement concrete for all Basement and surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates ...
Adding 10 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Adding 50 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Adding 60 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying...
Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works and super structure works
of bridges upto 3.50 m height. The granite/t...
Adding 60 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Adding 50 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Adding 70 Percentage Additional on finished rate of concrete per m3 for Formwork, Centering and Scaffolding. Percentage Additionalities for Formwork,Centering and Scaffolding,)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-4 Market.doc
Tender Document • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .