Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.7 L+₹49,854.32 (6.89%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MRP ENTERPRISES | ASHWATH MARINE INFRA PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Clearing the light jungle and disposing effectively from the site including cost of all labour, lead, lift, etc., complete | 606 | M2 | 4,605.6 ₹5,434.61 | 4,302.6 ₹5,077.07 Lowest |
| 2.00 | Dismantling the existing RR stone Masonry for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete. | 1.3 | M3 | 435.5 ₹513.89 | 405.6 ₹478.61 Lowest |
| 3.00 | Pointing with C.M 1:6, flush pointing for R.R. masonry including cost of all materials, labours, lead, lift, curing, etc. complete. | 606 | M2 | 2,09,070 ₹2,46,702.6 | 1,95,132 ₹2,30,255.76 Lowest |
| 4.00 | Clean removal of cement plaster from walls including cost of all materials, labours, lead, lift, curing, etc. complete. | 115.2 | M2 | 1,152 ₹1,359.36 | 1,082.88 ₹1,277.8 Lowest |
| 5.00 | Plastering with C.M 1:3, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete. | 115.2 | M2 | 38,592 ₹45,538.56 | 36,057.6 ₹42,547.97 Lowest |
| 6.00 | Collection and insertion of glass pieces over the top surface of compound wall for safety purpose including cost of glass pieces, labour, lead, lift, etc., complete. | 303 | M | 17,574 ₹20,737.32 | 16,362 ₹19,307.16 Lowest |
| 7.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 1.3 | M3 | 13,773.5 ₹16,252.73 | 12,911.6 ₹15,235.69 Lowest |
| 8.00 | Providing barbed wire fencing over Compound wall top with angle size 50mm x 50mm x 6mm and 2ply 10 gauge G.I. barbed wire and tying with angle horizontally and vertically through the holes in the 'Y' bracket with the required tension as per the direction of the Engineer at site including cost of binding wire, barbed wire etc., and transporting charges, labour, lead, lift, etc., complete. | 303 | Rm | 3,80,265 ₹4,48,712.7 | 3,56,025 ₹4,20,109.5 Lowest |
| 9.00 | Providing two legged scaffolding using 10cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W. Planks of 40mm thick and 1m width etc., complete using coir and nails. | 606 | M2 | 1,07,868 ₹1,27,284.24 | 1,01,202 ₹1,19,418.36 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,700
Closing Date
29 Aug 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair and Maintenance Works to the Barbed Wire Fencing over the Compound Wall from Token Gate to Gate No. 6 near TTPS Main Entrance
2025_EB_592009_1
CE SE C TTPS 207 2025 26
Open Tender
Civil Works - Others
Item Rate
60 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,700
Yes
28 Oct 2025
12 Aug 2025
30 Aug 2025
12 Aug 2025
29 Aug 2025
12 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .