Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.5 LAccepted-AOC NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹51.5 L Quoted ₹60.0 L | L1 | Accepted-AOC L1 Bidder AOC issued |
| 2 | L2₹60.9 LRejected-AOC | ₹60.9 L | L2 | Rejected-AOC L2 Bidder Rejected |
| Sl No | Description | Qty | Unit | Renga Engineering Works India Pvt Ltd L1 | Mani Engineering Works L2 |
|---|---|---|---|---|---|
| 1.00 | I. Material Portion: ISMC 150x75 | 3.73 | MT | 67,945 ₹2,99,053.12 | 69,000 ₹3,03,696.6 |
| 2.00 | IM.S Plate 10 mm TK | 0.87 | MT | 90,522 ₹92,929.89 | 91,800 ₹94,241.88 |
| 3.00 | M.S Plate 5 mm TK | 9.41 | MT | 88,810 ₹9,86,128.48 | 90,200 ₹10,01,562.76 |
| 4.00 | ISA 50 x 50 x 6 | 2.16 | MT | 66,554 ₹1,69,632.84 | 67,600 ₹1,72,298.88 |
| 5.00 | II. Labour Portion: Dismantling of existing severely damaged / corroded technological structure for conveyor-9, which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc. | 8.08 | MT | 11,680 ₹1,11,361.79 | 11,855 ₹1,13,030.31 |
| 6.00 | Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges, T&P charges and consumables etc. | 16.17 | MT | 6,152 ₹1,17,383.85 | 6,244 ₹1,19,139.27 |
| 7.00 | Fabrication of technological structure for conveyor-9 by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges. | 16.17 | MT | 85,536 ₹16,32,078.2 | 86,819 ₹16,56,558.61 |
| 8.00 | Erection of technological structure for conveyor-9 by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges consumables and T&P hire charges. | 16.17 | MT | 94,923 ₹18,11,187.79 | 96,347 ₹18,38,358.57 |
| 9.00 | Cleaning the surface with shot basting the structures of channel and plates including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges. | 730 | M² | 322 ₹2,77,370.8 | 327 ₹2,81,677.8 |
| 10.00 | Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70 microns), one coat of MIO epoxy undercoating (100-120 microns DFT) & one coat of aromatic poly urethane (30-35 microns DFT) including cost of Thinner, T&P’s & consumables | 730 | M² | 423 ₹3,64,372.2 | 429 ₹3,69,540.6 |
Tender Value
Refer Docs
EMD Value
₹49,250
Closing Date
4 Jul 2025, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
TNPGCL NCTPS I SE M II Circle ICHS Dn Replacement of existing severely damaged corroded Technological Structure in conveyor 9 of ICHS
2025_EB_571531_1
CE/NCTPSI/SE/MII/SpNo42/25-26
Open Tender
Power/Energy Projects/Products
45 days
NCTPS-I Chennai
Refer the tender documents
3 documents required · 3 mandatory
₹0
₹49,250
Yes
17 Mar 2026
20 Jun 2025
5 Jul 2025
20 Jun 2025
4 Jul 2025
20 Jun 2025
Amount
I. Material Portion: ISMC 150x75
IM.S Plate 10 mm TK
M.S Plate 5 mm TK
ISA 50 x 50 x 6
II. Labour Portion: Dismantling of existing severely damaged / corroded technological structure for conveyor-9, which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc.
Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges, T&P charges and consumables etc.
Fabrication of technological structure for conveyor-9 by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of technological structure for conveyor-9 by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges consumables and T&P hire charges.
Cleaning the surface with shot basting the structures of channel and plates including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges.
Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70 microns), one coat of MIO epoxy undercoating (100-120 microns DFT) & one coat of aromatic poly urethane (30-35 microns DFT) including cost of Thinner, T&P’s & consumables
Cost of paint for one coat of Zinc phosphate epoxy primer (60-70 microns DFT) in the structures of angle and plates.
Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures of angle and plates.
Cost of paint for one coat of aromatic poly urethane (30-35 microns DFT) with total DFT of 190 to 225 microns in the structures of angle and plates.
Mani Engineering Works (BID ID -1389710)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid