| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC ALL DOCUMENTRY CONDITION ARE FULLFILLED | |
| 2 | L2₹30.1 L+₹31,246.75 (1.05%)Rejected-Finance | L2 | Rejected-Finance RRates of Bidder are below estimated rates and also higher among three. | |
| 3 | L3₹30.3 L+₹46,538.90 (1.56%)Rejected-Finance | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | M/S DIVINE BLESSED ENTERPRISES L1 | M/S Z.A BUILDCON L3 | M/S SAVERA BUILDCON L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Manual | 342.47 | Cum | 127 ₹43,493.69 Lowest | 128 ₹43,836.16 | 128 ₹43,836.16 |
| 2.00 | Dismantling of existing metalled road including disposal with in 30 m | 22.89 | Cum | 426 ₹9,751.14 Lowest | 433 ₹9,911.37 | 430 ₹9,842.7 |
| 3.00 | Laying P.C.C.1:2:4 M-15 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete. but excludiing the cost of shuttering. | 24.72 | Cum | 5,734 ₹1,41,744.48 Lowest | 5,825 ₹1,43,994 | 5,794 ₹1,43,227.68 |
| 4.00 | Laying P.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 10.65 | Cum | 6,206 ₹66,093.9 Lowest | 6,300 ₹67,095 | 6,271 ₹66,786.15 |
| 5.00 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 11 | Cum | 6,580 ₹72,380 Lowest | 6,683 ₹73,513 | 6,649 ₹73,139 |
| 6.00 | Laying R.C.C. M-25 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete | 89.09 | Cum | 7,380 ₹6,57,484.2 Lowest | 7,495 ₹6,67,729.55 | 7,456 ₹6,64,255.04 |
| 7.00 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | 8.48 | M.T. | 62,535 ₹5,30,296.8 Lowest | 63,512 ₹5,38,581.76 | 63,186 ₹5,35,817.28 |
| 8.00 | Centering and shuttering in straight portion of C.C. pier and abutment.including cost of all material,labour and T & P etc. Complete | 92.32 | Sqm | 480 ₹44,313.6 Lowest | 488 ₹45,052.16 | 485 ₹44,775.2 |
| 9.00 | Ordinary centering and shuttering of ply wood or steel for R.C.C work.including cost of all material,labour and T & P etc. Complete | 203.4 | Sqm | 790 ₹1,60,686 Lowest | 801 ₹1,62,923.4 | 797 ₹1,62,109.8 |
| 10.00 | Providing & Fixing in position Bituminous paper bearing (Tarfelt) as per direcrion of Engineer in charges giving a coat of approved mastic paint below the rarfelt and including supply of materials labour and T&P etc. required for proper completion of the work. | 8.87 | Sqm | 203 ₹1,800.61 Lowest | 207 ₹1,836.09 | 206 ₹1,827.22 |
Tender Value
₹31.1 L
EMD Value
₹62,120
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF D.R.B AT KM 2.480 OF MOHD.PUR TANDA MINOR.
2026_UPIDC_1138603_1
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
60 days
MOHAMMADPUR TANDA SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹674
Yes
₹62,120
Yes
SAMBHAL
27 Jul 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Manual | - | Cum | - | - |
| 2 | Dismantling of existing metalled road including disposal with in 30 m | - | Cum | - | - |
| 3 | Laying P.C.C.1:2:4 M-15 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete. but excludiing the cost of shuttering. | - | Cum | - | - |
| 4 | Laying P.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | - | Cum | - | - |
| 5 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | - | Cum | - | - |
| 6 | Laying R.C.C. M-25 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete | - | Cum | - | - |
| 7 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | - | M.T. | - | - |
| 8 | Centering and shuttering in straight portion of C.C. pier and abutment.including cost of all material,labour and T & P etc. Complete | - | Sqm | - | - |
| 9 | Ordinary centering and shuttering of ply wood or steel for R.C.C work.including cost of all material,labour and T & P etc. Complete | - | Sqm | - | - |
| 10 | Providing & Fixing in position Bituminous paper bearing (Tarfelt) as per direcrion of Engineer in charges giving a coat of approved mastic paint below the rarfelt and including supply of materials labour and T&P etc. required for proper completion of the work. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.60 MB
BOQ_2125872.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .