Loading…
Loading…
Tender Value
₹5.5 L
EMD Value
₹11,500
Closing Date
17 Jun 2026, 5:00 pm
EE ECD(D) VARANASI
EE ECD(D) VARANASI
CONSTRUCTION OF TOILET FOR SE, EUDC-1st AND 2nd AT SIGRA AND CONSTRUCTION OF PARKING SHED AT SIGRA VARANASI.
2026_PVVNV_1155037_1
42/ECDD(V)/2026-27
Open Tender
Civil Works
75 days
SIGRA VARANASI.
Scan Copy of Prequalification Condition is enclosed in Tender Specification.
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER ECD(D) VARANASI
₹11,500
28 May 2026
28 May 2026
18 Jun 2026
28 May 2026
17 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 8 | CUM | 191 | ₹1,528 | 2.8.1 |
| 2 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). (Code No. 4.1.10) | 4.2 | CUM | 4,791 | ₹20,122.2 | 4.1.10 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.98 | CUM | 6,649 | ₹13,165.02 | 5.1.2 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.5 | CUM | 5,242 | ₹13,105 | 6.1.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 3.6 | Sqm | 288 | ₹1,036.8 | 5.9.1 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Weather shade, Chajjas, corbels etc., including edges | 2 | Sqm | 699 | ₹1,398 | 5.9.19 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick | 2.6 | Sqm | 756 | ₹1,965.6 | 5.9.20 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like | 13.7 | Sqm | 288 | ₹3,945.6 | 5.9.15 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls | 2.6 | Sqm | 153 | ₹397.8 | 5.9.16.1 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.95 | CUM | 7,977 | ₹15,555.15 | 5.2.2. |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.21 MB
SPECI42.pdf
Additional Documents • 3.98 MB
TENDERDOCUMENTSVARANASI.pdf
Tender Documents • 0.96 MB
BOQ_2163605.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid