| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-AOC FATORDA CONSTITUENCY | SOUTH GOA | GOA | 403103 | ₹33.3 L | L1 | Accepted-AOC Accepted Being L1 Bidder |
| 2 | L2₹35.2 L+₹1.9 L (5.68%)Rejected-Finance | ₹35.2 L+₹1.9 L (5.68%) | L2 | Rejected-Finance Rejected Being L2 Bidder |
| 3 | L3₹35.3 L+₹2.0 L (6.13%)Rejected-Finance | ₹35.3 L+₹2.0 L (6.13%) | L3 | Rejected-Finance Rejected Being L3 Bidder |
| 4 | L4₹35.6 L+₹2.3 L (6.88%)Rejected-Finance GOA | ₹35.6 L+₹2.3 L (6.88%) | L4 | Rejected-Finance Rejected Being L4 Bidder |
| 5 | L5₹35.7 L+₹2.5 L (7.38%)Rejected-Finance GOA GOA | SOUTH GOA | GOA | 403703 | ₹35.7 L+₹2.5 L (7.38%) | L5 | Rejected-Finance Rejected Being L5 Bidder |
Tender Value
₹41.6 L
EMD Value
₹83,191
Closing Date
17 Aug 2026, 11:00 amClosed
Executive Engineer DIV VIII ASW-I PWD Fatorda
Executive Engineer DIV VIII ASW-I PWD Fatorda
Providing and fixing of Galvanium Sheet roofing shed within Laxmi Narayan Temple premises, Dongri, Navelim in Navelim Constituency.
2026_PWD_30976_1
PWD/Div8/ASW/2001/17/26-27/L3
Open Tender
Civil Works - Buildings
Percentage
90 days
Fatorda
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Yes
₹83,191
Yes
19 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
17 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing rigid PVC S.W.R. (soil, waste & rain water drainage pipes of approved including lubricant etc. complete (single/double) socketed:110 mm dia | 150 | metre | 295 | ₹44,250 |
| 2 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) (Square Hollow Section (SHS) IS4923 /Rectangular Hollow Section (RHS) IS4923/ Circular Hollow Section (CHS) IS1161 closed Structural Steel of (SAIL, TATA. VIZAG, JSW ,APOLLO Steel Ltd.) make (Min Yeild Stress 310 Mpa)) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | 16,546 | kg | 184 | ₹30,44,464 |
| 3 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. | 1 | sq.m | 107 | ₹106.89 |
| 4 | Providing and fixing colour coated galvulium roofing sheets of 0.5mm thickness including all the accessories (TATA make) but excluding the cost of purlins, rafters, trusses, flashings etc. complete as per the directions of the Engineer in charge. | 1 | sq.m | 870 | ₹869.13 |
| 5 | Add for providing & fixing Flashings -[Corners, Ridges, valleys, gable end & Trims] (Girth above 610mm) including all the accessories complete as per the directions of the Engineer in charge. | 111 | metre | 774 | ₹85,914 |
| 6 | Providing and laying factory made Shot blasted cement concrete interlocking paver block of minimum M35/M40 grade made by heavy duty block making machine with strong vibratory compaction and of aprpoved size and design / shape laid in 50 mm thick compacted bed of coarse sand, filling the joints with coarse sand, etc. all complete as per the direction of Engineer.- in I, Wave, Rectangular, Square etc. shapes. The products should comply to IS 15658:2006 and manfucatured by ISO9001: 2008 certified plant. The shot blasting should be done using 0.4-0.5mm dia steel shots with a speed of 3200 rpm. 60 mm thick in all colours except grey (M35 grade) | - | sq.m | 1,200 | - |
| 7 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.All kinds of soil | 69 | cu.m | 291 | ₹20,079 |
| 8 | Centering & shuttering including Strutting, Propping & removal of forms for :Foundations, Footings, Bases for columns | - | sq.m | 407 | - |
| 9 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 1 | cu.m | 2,211 | ₹2,208.79 |
| 10 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:All works upto plinth level | 9 | cu.m | 7,292 | ₹65,628 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 1.63 MB
BOQ_31374.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .