Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
23 Aug 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE BLOCK DEVELOPMENT OFFICER (BP)
Union Office
Madurai District Construction of Small Culvert at Sangam Streetin T.Puthupatty Village and Panchayat Thirumangalam Block
2024_RDTN_475830_1
35/MDU-TMM/15 FC(BP) 24-25
Open Tender
Civil Works
Works
90 days
Thirumangalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
Yes
23 Aug 2024
22 Aug 2024
23 Aug 2024
22 Aug 2024
23 Aug 2024
22 Aug 2024
Amount
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
PCC 1:3:6 mix using 40mm metal from approved sources including cost and conveyance rough stones and bond stones including cost of cement which will be supplied departmentally at the departmental section stores and cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental stores to the actual workspot and handling charges for the same at each and all other incidental charges such as baling out water if necessary etc., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire will be supplied by the contractor as per clause MOST specification.
Cement concrete 1:2:4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Bed Block.
Reinforced Cement concrete 1:11/2:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Deck Slab.
Provision for Name board for the Each Village
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T RAVI RAGHUL (BID ID -1117550)
stage.html
html • 0.02 MB
finance_565072.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .