Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.3 L
EMD Value
₹12,000
Closing Date
13 Nov 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Construction and Works Circle-I, Room No. 125, Urja Bhawan, Old Building, P.V.V.N.L., Victoria Park, Meerut
Increasing capacity of 33 KV Substation Navyug Market, Ghaziabad in District Ghaziabad under Scheme of Business Plan 2024-25 (Part-2)
2024_PVVNL_971061_1
02/ECWC1/MRT/2024-25
Open Tender
Electrical Works
Lump-sum
60 days
Meerut
Please refer tender Notice and Tender documents
3 documents required · 3 mandatory
₹3,540
Payable to E.E.E.C.W.D., Ghaziabad
₹12,000
11 Dec 2024
7 Nov 2024
14 Nov 2024
7 Nov 2024
13 Nov 2024
7 Nov 2024
Carriage of following material from PVVNL Store 11KV XLPE cable 3x300mm²
11KV Cable J/kit outdoor type for 3x300mm
11KV Cable J/kit indoor type for 3x300mm
33KV Fuse set
M.S.Round 32mm
Loading, Safe carriage & unloading of following stock material from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively. Angle channel, Conductor
Erection of Following Material & Miscellaneous Electrical Works. Removal of existing 5MVA Transformer and other accessories equipments. Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 05MVA Power transformer.
Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor
Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
Re-filling the transformer oil (old & used in existing 5MVA T/F)
Renovation of transformer Plinth
Installation for 33/11KV 10MVA T/F Safe Shifting of 10MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
Erection & Installation of 10MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
Water level earthing by Boring and lowering by providing of G.I.Pipe size 40mm dia of 2mm thickness, into the ground upto water level or minimum 50Mtr, which ever is more, with the lower end of solid copper cone Approx 224mm long and 750gm in weight shall be provided and screwed in pipe as well as bringing out a continuous 6SWG copper wire, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through providing Copper Bond Strip of size-50x6mm.
Supply & Erection solid copper cone Approx 225 mm long and 750 gm in weight
Providing & laying of G.I.Strip of size 50x6mm for connecting the earthmat with each equipment (Terminal Gantry, Bus Gantry, Bus Isolators, Line Isolator, 33KV C.T., 33KV V.C.B., L.As., Fuse Set, Post Insulators, T/F Body & its neutral and M.S.Frame of Cable Supporting Structure), various steel structures. The work also includes cutting, bendidng, straightening, over-laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches.
Painting of Earth Strip of size (50x6) mm with one coat of ready mixed primer with two coats of ISI mark synthetic channel green paint.
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100x50mm. Structure shall be 4 Mtr. Long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer.
Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50x6) mm pieces of size 750 mm long each by welding at equal intervals and grouting in a block of size (300x300x700)mm in C.C. 1:3:6 (cement, coarse sand and stone ballast) complete and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts.
Fabrication and grouting of M.S. Frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The M.S. frame shall be made of M.S. channel (100x50)mm in ‘T’ shape. Providing 2 Nos. support of M.S. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint and grouting the frame in C.C. ratio 1:3:6 (cement, coarse sand and stone ballast) in a block of size (300x300x700) mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminium binding wire in complete.
Supply & Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
Providing & Fixing 150mm dia 2mm thick 3M long G.I.Pipe over 33KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on double pole / Cable support structure. The work includes fixing of Clamp, sealing of top and bottom end of the M.S.Pipe. One end of M.S.Pipe is to be buried under earth about 500mm.
H.T. Power Cable Laying: Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.50 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
Laying and dressing of 11 KV 3x300 mm2 power cable in air/Trench.
Preparation of 11 KV Power Cable ends: Making of 11 KV XLPE Heat shrinkable outdoor jointing kits 3x185Sq.mm/3x300Sq.mm after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs
Making of 11 KV XLPE heat shrinkable indoor jointing kits 3x185Sq.mm/3x300Sq.mm in switch gears after carefully removing the insulation of cable, providing and crimping of proper size of lugs, plumbing and taping of cable with good quality available insulation tape with J/Kit boxes, Fixing and insulating of lugs on cable with switch gear complete in all respect.
Installation of 33 KV Fuse Set: Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required.
Earthing of outdoor equipment, details as given below:- Cutting of 32mm.dia M.S. Bar-3Mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge and Delta proper welding with M.S.Bars.
Digging of Pits & making of Bridge on L.A. & T/F neutral earthing by laying 32mm. dia M.S.Round in rectangular shape. Electric welding on cross joints by providing “U” Clamp in size 25x6mm. of M.S.Flat and inter connecting both by M.S.Round 32mm.dia with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.
Digging of Trench of size-0.50x0.75x330M.,for laying of Earth mat throughout in switchyard and re-filling &ramming of the same earth in the to the trenches after completion of earth mat work.
Laying of 32mm.dia M.S.Bar in Trench, properly in alignment along the length and width in switchyard.
Cutting of 32mm.dia M.S.Bar-3M.long and making one end in conical shape, by forging process and driving it into the earth, in trench at fixed distance as per drawing and properly welding with M.S.Bar Earthmat.
Proper continuous electric welding of overlap joints of M.S.Bar upto a length of 150mm. On both sides,along the length of M.S.Bar and an extra piece of 12mm M.S.Round-150mm.long, providing on both sides of Overlap Joints and continuous electric welding on both side, along the length of M.S.Bar. All joints shall be painted with black bituminous paint.
Painting of Structures Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. Painting of Substation Structures
Construction of fire protection wall size 5Mtrx4.5Mtr above ground level (as per approved Drawing). Providing required Civil Material by the Contractor.
Hiring of D/G Set including carriage, loading, unloading & operating charges (With fuel) at 33/11KV Substation under construction in case L.T. Supply is not available near S/s within prescribed accessible limit. 63KVA, Three phase, D/G Set for fabrication of different structure at Substation.
Old material received site to PVVNL store including empty cable steel drum.
Raj Engineers (BID ID -4717320)
SHASHI ENTERPRISES (BID ID -4718473)
Hi-tech power transmission (BID ID -4714976)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .