Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹10.9 L+₹99,000 (10.0%)Rejected-Finance 143 ALLAHABADPUR GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L2 | Rejected-Finance Not Being Lowest Bidder | |
| 3 | L3₹11.9 L+₹2.0 L (20.0%)Rejected-Finance E 30 RAJIV NAGAR BEGAMPUR NEW DELHI 110086 | NEW DELHI | NEW DELHI | DELHI | 110086 | L3 | Rejected-Finance Not Being Lowest Bidder | |
| 4 | L4₹12.7 L+₹2.8 L (28.3%)Rejected-Finance HN 2 PREETI NAGAR PHASE II FAIZULLAGANJ LUCKNOW UTTAR PRADESH 226020 | LUCKNOW | UTTAR PRADESH | 226020 | L4 | Rejected-Finance Not Being Lowest Bidder | |
| 5 | L5₹13.7 L+₹3.8 L (38.9%)Rejected-Finance | L5 | Rejected-Finance Not Being Lowest Bidder |
Tender Value
₹24 L
EMD Value
₹48,000
Closing Date
30 May 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE E/M Lucknow
Garrison Engineer E/M, 36 LBS Marg, Lucknow Cantt, Lucknow (U.P.) PIN 226002
MANNING AND OPERATION OF MES INSTALLATION / AC PLANTS AT VARIOUS LOCATIONS IN THE AREA OF AGE E/M EXT (WS) UNDER GE E/M LUCKNOW.
2020_MES_342157_1
GE/EM/LKO/EXT(WS)/T-08 OF 2020-2021
Open Tender
Miscellaneous Works
Item Rate
335 days
Lucknow
Class E or above, category d (v).
8 documents required · 8 mandatory
₹500
GE E/M Lucknow
₹48,000
Yes
10 Jul 2020
1 May 2020
1 Jun 2020
1 May 2020
30 May 2020
16 May 2020
60 days
Amount
Providing service for unintrerrupted " Manning and Operation " of Central AC plant installation of various capacities including AHU and chilled water system installed and All control system related central AC Plant etc as per shift mentioned below against respective plant by deploying operator ( skilled ) adequately qualified ,in each installation one ( Operator ) for each shift 8 ( eight ) hrs at each installation including Sundays and Holidays, complete all as specified and directed by Engineer-in -charge at the following location :- (a) Signal centre central command ( Three Shift ) ( b ) Receiver cetre ( Three Shift) ( c ) AFMSD (Two Shift ) Note :- ( i ) Total man power 08 Nos operator for 03 central AC plant, each in shift operated .
Notes : Rates quoted by the contractor shall be inclusive for following item :- (i) Contractor shall provided necessary T & P for General Maintanace and opertation . (ii) The log sheets indicating daily fuel consumption, engine oil, lubricant grease, hours run, etc will be maintained by the contractor in each installations. Contractor shall provided Log book, Attendence Register,Plant running record book and rate quoted by the contractor shall deemed to included in his quoted rates . (iii) The contractor will be responsible for upkeep of the installations in neat and tidy conditions and in a presentable manner. The surrounding of the installation will also be maintained neat and clean by removing grasses and other vegetation. (iv) The site documents such as Log Sheet, Attendance etc will be checked daily by JE, weekly by Engineer-in-Charge and monthly by GE.
Notes contd/---- : (v) All plant and machinery equipment and other items belonging to plant including safety shall be responsibility of manpower employed by the contractor. (vi) If any slackness noticed a suitable action shall be initiated as per the existing rule and contract is liable to be terminated . (vii) The operator should have knowledge of safety precautions and first aid. (viii) Contractor shall provided two set of uniform, Shoe with Name Plate , Mobile connection , Etc (ix) Minor stores required should be provided by the contractor. (x) Major stores required for ractification of complaint will be supplied by the demartment. (xi) Contractor shall submit insurance cover of all the workers employed by him for 11 Month period. (xii) Contractor shall strictly followed Periodicity mentioned in P S clauses.
Sanjai sales and services
GIAN ENGINEERS
Ajanta Associates
jay maa engineers
Enviro India
M/S Hind Constructions
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .