| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAccepted-AOC AT PO KULEI PS BANPUR KHORDHA 752034 | KULEI | KHORDHA | ODISHA | 752034 | ₹40.0 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L3₹43.3 L+₹3.2 L (8.01%)Rejected-Finance | ₹43.3 L+₹3.2 L (8.01%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 3 | L3₹43.9 L+₹3.9 L (9.64%)Rejected-Finance | ₹43.9 L+₹3.9 L (9.64%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 4 | L3₹50.1 L+₹10.1 L (25.2%)Rejected-Finance | ₹50.1 L+₹10.1 L (25.2%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 5 | L3₹59.3 L+₹19.3 L (48.1%)Rejected-Finance AT P O KHANDASAHI P S KAKATPUR DIST PURI PIN 7521119 | KHANDASAHI | PURI | ODISHA | 7521119 | ₹59.3 L+₹19.3 L (48.1%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
Tender Value
₹59.3 L
EMD Value
₹59,320
Closing Date
6 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
NH5 to Adiapada road_Road_Pot hole repair, BUSG, SDBC, CC Overlaying-600 mtr-, PCC Protection wall -200mtr- 0.400 to 1.200 1.800 to 2.200 1.200 to 1.800 1.800 to 2.000
2026_CERWI_133095_1
Tender online 06/2026-27 of BBSR
Open Tender
Civil Works - Roads
Percentage
90 days
Khordha
4 documents required · 4 mandatory
₹10,000
₹59,320
Yes
21 Sept 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
25 Jun 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete as per direction of E.I.C. | 10,000 | Sqm | 8.44 | ₹84,400 |
| 2 | Construction of granular sub-base by providing close grade granular sub-base grading-III material as per table-100-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H Specifications for Road & Bridges work (4th Revision)(A/R-2006 page-160 item No-39). | 94.23 | Cum | 1,781.34 | ₹1,67,855.67 |
| 3 | Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision) | 634.5 | Cum | 2,563.74 | ₹16,26,693.03 |
| 4 | Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per clause 502 of MOSRT&H Specifications for Road & Bridges work (4th Revision) | 4,314.6 | Sqm | 93.24 | ₹4,02,293.3 |
| 5 | Providin & laying Semi Dense Bituminous Concret with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alingment, roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works (4th Revision) Page -175 item - 47 | 107.87 | Cum | 13,287.7 | ₹14,33,344.2 |
| 6 | Supplying & filling moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 207.45 | Cum | 562.22 | ₹1,16,632.54 |
| 7 | Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge. | 33.75 | Cum | 282.88 | ₹9,547.2 |
| 8 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 77.63 | Cum | 1,505.17 | ₹1,16,846.35 |
| 9.01 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification.
Foundation | 83.33 | Cum | 5,595.66 | ₹4,66,286.35 |
| 9.02 | Sub-Structure | 37.8 | Cum | 5,758.88 | ₹2,17,685.66 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.77 MB
Tendernotice_1.pdf
PDF • 2.07 MB
BOQ_598039.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .