Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC 01 VILLAGE BABOORI BARARI MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | ₹49.8 L | L1 | Accepted-AOC Tender Allotted |
| 2 | L2₹53.9 LRejected-AOC 2ND FLOOR PLOT NO 442 JLPL INDUSTRIAL AREA MOHALI PLOT 442 JLPL INDUSTRIAL AREA SECTOR 82 9988610098 MOHALI CHANDIGARH UT 160055 | 998861 | ₹53.9 L | L2 | Rejected-AOC 2nd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical PLOT NO E 32 C D F INDUSTRIAL AREA CHHERATH ANOOPSHAHAR ROAD ALIGARH UTTAR PRADESH ALIGARH ALIGARH UTTAR PRADESH 202122 | ALIGARH | UTTAR PRADESH | 202122 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Drexel Electronics and Engineering products Pvt Ltd L2 | ASHOK KUMAR L1 |
|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and commissioning of Online Effluent Quality Monitoring System with complete Engineering Panel, Cloud connector (Devices) for online server connectivity with all electronics for monitoring parameters including
COD, BOD, TSS and pH including online data transfer to HSPCB, CPCB and PHED website on daily basis complete at existing 3 Nos STP in Rewari Town for online (continuous) measurement of PH, Total suspended solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (Spectral measurement in the UV-VIS range 200-720 mm and other letest parameter (required time to time) as per CPCB/HSPCB) performing reagent and chemical free analysis with automatic cleaning of censor, single cables and power cables, local data acquisition and display of data on continuous basis for up linking the date to CPCB, HSPCB and PHED, TUV approved complete in all respects as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender. A) Multi-Parameter measuring converter, for connecting upto 18 intelligent sensors, scope includes 6 analog outputs (0/4-20mA), widerange
power supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the inlet/ effluent/ BNR part of municipal waste water treatment plants at various Locations in Haryana State with integrated with automatic cleaning. B) Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC), Cable length 100 meter (minimum) C) Sensor adapter cable for all intelligent sensors, with lP68 water proof connection to the intelligent Sensor Net system, Cable length 100 meter (minimum). D) Data transfer to CPCB, HSPCB
and PHED servers complete as per satisfaction of Engineer-in-Charge E) Providing GSM 4G/5G/ latest modem with mobile.
1 no. for 6.5 MLD STP at kaluwas, Rewari Town
1 No for 8 MLD STP at Nasia JI Road Rewari Town.
1 No for 16 MLD STP at Nasia JI Road Rewari Town. | 3 | Each | 9,99,398 ₹30.0 L | 11,00,000 ₹33 L |
| 2.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device
(one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD, 16 MLD and 6.5 MLD STP for 2nd year | 1 | Job | 2,66,000 ₹2.7 L | 2,00,000 ₹2 L |
| 3.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device
(one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability
period. 8 MLD, 16 MLD and 6.5 MLD STP for 3rd year | 1 | Job | 2,66,000 ₹2.7 L | 2,00,000 ₹2 L |
| 4.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year
defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability
period. 8 MLD, 16 MLD and 6.5 MLD STP for 4th year | 1 | Job | 2,66,000 ₹2.7 L | 2,00,000 ₹2 L |
| 5.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 5th year | 1 | Job | 2,66,000 ₹2.7 L | 1,80,000 ₹1.8 L |
| 6.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 6th year | 1 | Job | 2,66,000 ₹2.7 L | 1,80,000 ₹1.8 L |
| 7.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 7th year | 1 | Job | 2,66,000 ₹2.7 L | 1,80,000 ₹1.8 L |
| 8.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 8th year | 1 | Job | 2,66,000 ₹2.7 L | 1,80,000 ₹1.8 L |
| 9.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 9th year | 1 | Job | 2,66,000 ₹2.7 L | 1,80,000 ₹1.8 L |
| 10.00 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 10th year | 1 | Job | 2,66,000 ₹2.7 L | 1,80,000 ₹1.8 L |
Updated dates
Tender Value
₹54.1 L
EMD Value
₹1.1 L
Closing Date
25 Apr 2026, 5:00 pmClosed
VINAY PRAKASH CHAUHAN
Rewari PHED No. 1
Supply, Installation, Testing and commissioning of Online Effluent Quality Monitoring System with complete Engineering Panel, Cloud connector (Devices) for online server connectivity with all electronics for monitoring parameters including COD, BOD,
2026_HRY_515257_1
20262F9CB782 2F17 44AD ABCF A1A2998B9058579PUH
Open Tender
Civil Works
150 days
Rewari
As per CBD
2 documents required · 2 mandatory
₹5,000
₹1.1 L
Yes
25 May 2026
15 Apr 2026
27 Apr 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
15 Apr 2026 - 17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing and commissioning of Online Effluent Quality Monitoring System with complete Engineering Panel, Cloud connector (Devices) for online server connectivity with all electronics for monitoring parameters including
COD, BOD, TSS and pH including online data transfer to HSPCB, CPCB and PHED website on daily basis complete at existing 3 Nos STP in Rewari Town for online (continuous) measurement of PH, Total suspended solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (Spectral measurement in the UV-VIS range 200-720 mm and other letest parameter (required time to time) as per CPCB/HSPCB) performing reagent and chemical free analysis with automatic cleaning of censor, single cables and power cables, local data acquisition and display of data on continuous basis for up linking the date to CPCB, HSPCB and PHED, TUV approved complete in all respects as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender. A) Multi-Parameter measuring converter, for connecting upto 18 intelligent sensors, scope includes 6 analog outputs (0/4-20mA), widerange
power supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the inlet/ effluent/ BNR part of municipal waste water treatment plants at various Locations in Haryana State with integrated with automatic cleaning. B) Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC), Cable length 100 meter (minimum) C) Sensor adapter cable for all intelligent sensors, with lP68 water proof connection to the intelligent Sensor Net system, Cable length 100 meter (minimum). D) Data transfer to CPCB, HSPCB
and PHED servers complete as per satisfaction of Engineer-in-Charge E) Providing GSM 4G/5G/ latest modem with mobile.
1 no. for 6.5 MLD STP at kaluwas, Rewari Town
1 No for 8 MLD STP at Nasia JI Road Rewari Town.
1 No for 16 MLD STP at Nasia JI Road Rewari Town. | - | Each | - | - |
| 2 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device
(one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD, 16 MLD and 6.5 MLD STP for 2nd year | - | Job | - | - |
| 3 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device
(one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability
period. 8 MLD, 16 MLD and 6.5 MLD STP for 3rd year | - | Job | - | - |
| 4 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year
defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability
period. 8 MLD, 16 MLD and 6.5 MLD STP for 4th year | - | Job | - | - |
| 5 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 5th year | - | Job | - | - |
| 6 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 6th year | - | Job | - | - |
| 7 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 7th year | - | Job | - | - |
| 8 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 8th year | - | Job | - | - |
| 9 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect
liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 9th year | - | Job | - | - |
| 10 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,
16 MLD and 6.5 MLD STP for 10th year | - | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_594096.xls
BOQ • 0.27 MB
777963Z150038.pdf
Additional Documents • 6.36 MB
Download all tender documents and submit your bid