Tender Value
₹4.5 L
EMD Value
₹9,020
Closing Date
29 Sept 2026, 2:00 pm
Executive Engineer MCD-III Jammu
Executive Engineer MCD-III Jammu
Upgradation of drain near transformer lane no 24 and 25 sector -1 Swaran Vihar in ward no 64.
2026_HAUDD_324099_1
E-NIT No.JMC/D-III/30 of 2026-27
Open Tender
Civil Works
Percentage
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer MCD-III Jammu
₹9,020
9 Sept 2026
9 Sept 2026
30 Sept 2026
9 Sept 2026
29 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
1:3:6 or richer mix (i/c equivalent design mix) | 10.24 | Cum | 1,725.2 | ₹17,666.05 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 79.06 | Cum | 479.3 | ₹37,893.46 |
| 3 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 0.55 | Sqm | 2,516.85 | ₹1,384.27 |
| 4 | Removal of Excavated mulba, dismantled unserviceable material from the site of work by MT/Animal transport or other wise including loading /unloading complete job. | 62.9 | cum | 130 | ₹8,177 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 10.04 | Cum | 4,826.5 | ₹48,458.06 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 36.87 | Cum | 5,733.6 | ₹2,11,397.83 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.78 | Cum | 6,591.25 | ₹18,323.68 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.77 | Cum | 7,788.4 | ₹5,997.07 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 69.37 | Kg | 123.2 | ₹8,546.38 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 123.96 | Sqm | 286.35 | ₹35,495.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1092607.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .