Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 10 0 RAMBAG COLONY RATLAM RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
30 Jun 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Macadamization of Chinar Chowk Ladgoo Rambhama Samnoo road (Ladgoo Rambhama Samnoo sector) by way of providing/ Laying 100 mm thick Wet Mix in stetches, P/L of 50 mm thick bituminous Macadam, 25mm thick semidense with 6mm thick seal coat mechanica
2020_PWDJK_98786_4
23/2020-21/RNB/Kul/1164-84 Dated 20-06-2020
Open Tender
Civil Works
Item Rate
15 days
Kulgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,600
Executive Engineer RnB Division Kulgam
₹2.1 L
1 Jul 2020
24 Jun 2020
1 Jul 2020
24 Jun 2020
30 Jun 2020
24 Jun 2020
120 days
Amount
Scarifying metalled (water-bound) road surface including disposal or rubbing lead upto 50m and consolidation of the aggregate received from scarifying with power road roller of 8 to 1 0 tonne capacity.shion incld: cost and carraige of RBM and Pipes
Providing / laying of RCC pipes in proper position/ grade incld: earth work cutting and providing required quantity of RBM over pipes as cushion incld: cost and carraige of RBM and Pipes 18" Dia RCC Pipes
Providing/Laying 100mm Wet mix macadam on the preprared sub base with crushed quarry stone agg. of spacified grading ( as per IRC/MOST specification) including mixing of crushed material with pre determined quantity of water ( which should not varry from OMC determined as per IS:2720 PT-VIII by more than agg. limit) in accordince with specification to form dense mass which is spread and rolled with vibatory roller 80-100 KN speed of which should not exceed 5 Kms per Hour each layer and rolling should countinue till 98% density is achieved to approved lines / grades , X-sectons. The mixing is to be prepared in approved mechnical mixing plant of suitable capacity ( excluding laying of cold Emulsion with Bitumen pressure sprayer on surface free from dust dirt, wetness @0.75 Kgs/Sqm complete(but excluding cost of cold Emulsion) incld. all carriages taxes, octories, TP & E Testing Charges during execution of work complete job.
Providing and applying of tack coat using hot straight run bitumen of grade 80/100 including heating the bitumen, spraying the bitumen with mechnical operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications clause 503 of MOST on WBM Surface @0.75 Kg/Sqm including all carriages etc complete job.
P/L of Bitumenous macadam base course with stone agg. of quality size and grading as specified in C.P.W. D specifications and straight run bitumen of grade 80/100 @ 3.30% by weight of total mix including hot mixing of stone agg. and bitumen in hot mix plant transporting, mixed material and laying mixed with paver finisher to the required level and grade, rolling with road roller of 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specification (50mm compacted thickness) complete including cost and carriage of all materials. incld: Extra carriage beyond 15 Kms upto 25 Kms
P/L of 25mm thick Semidence asphaltic base course using mineral aggregate satisfying the gradation set out in specifications, with 5 percent binding content (by weight of total mix) bitumen of grade 80/100 @ 2.88 Kg/Sqm with the aid of hot mix plant and paver finisher including rolling with 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specifications (with bitumen 80/100 (quarry)including cost and carriage of all materials. incld: Extra carriage beyond 15 Kms upto 25 Kms
Providing and laying seal coat of premixed fine agg. (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs, of bitumen of grade 80/100 bitumen per Cum of fine agg. and 0.60 Cum of fine agg. Per 100 Sqm of road surface to achieve the desired compaction as per MOST specifications including rolling and finishing with road all complete
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 Kms from cutting edge, disposed earth is to be levelled and neatly dressed in all kins of soil
Supplying and filing of Khah Bajree incld: levelling, spreading, dressing , watering and consolidation with Road Compactor etc incld: cost and carriage of all materails (For Berm)
AFZAL CONSATRUCTION CO
stage.html
html • 0.02 MB
finance_187793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .