Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Units I to IV Attending the preventive breakdown maintenance works of Valves Pipe Lines reducers by cutting and welding gasket renewing of valves flanges etc
2021_EB_193393_1
SE / M-I / MTPS-I / TM / OT. 292 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
120 days
Mettur Thermal Power Station-I / Mettur Dam
As per the tender specification
4 documents required · 4 mandatory
₹0
₹5,100
Yes
24 Feb 2021
3 Feb 2021
18 Feb 2021
3 Feb 2021
17 Feb 2021
3 Feb 2021
Amount
Cutting and Welding of GLV 1"/1500/2500 class valves or equivalent joints by IBR Welder. Charges for cutting the defective 1" valve or equivalent 2 Nos 1" joints in drain / vent line, grinding and welding the new valve in the line by IBR welder.
Replacing the defective drain line valves, pipes or equivalent in Heater drip, Condenser air, Auxillary steam and drain water lines etc by Non IBR welder. Charges for cutting the defective 1" valve or pipe or equivalent joints in drain / vent line, grinding and welding the new valve / line in the line by Non IBR welder.
Replacing the defective drain line valves or equivalent in Cooling water lines and ACW lines by Non IBR welder. (ERW pipe, reducer & bends)
Overhauling of GV 250 /250 ATA III Gr. MO with Bypass Valve: Dismantling the valve, cleaning all the parts, checking the actuator bearings, seating surfaces. Lapping the gate and seat for perfect blue matching, reassembling the valve with new self sealing ring and gland packing. Checking and cleaning the actuator thrust base bearing and lubrication to the bearings.
Overhauling of GV 10"/1500 Class HO and PNRV 250 / 250 ATA , SCNRV 300 /150 Class, GV/GLV 10 “/150 class, 12 “/150, 300 class. Dismantling the valve, cleaning all the parts, Checking the seating surfaces. Lapping the gate/seat & flap/disc for perfect blue matching. Reassembling the valves with new self sealing ring and bonnet gaskets and gland packing rings.
Overhauling of GV 300/250 ATA III gr. MO/HO valve with Bypass valve Dismantling the valve, cleaning all the parts, checking the seating surfaces and Lapping the gate and seat for perfect blue matching, Reassembling the valve with new self sealing ring and gland packings. Checking and cleaning the actuator thrust base bearing and lubrication to the bearings.
Overhauling Of GV 100/250 ATA IX Gr M.O, GLV 4” Class 2500 M.O. Dismantling the valve, cleaning all the parts, checking the seating surfaces and actuator bearings. Lapping the gate and seat for perfect blue matching, Reassembling the valve with new self-sealing ring and gland packings.
Overhauling of GV 100 / 250 ATA III Gr. HO, GV 65 /250 ATA III Gr. MO/HO, GV 2.5”, 4" 2500 Class HO/MO valves Dismantling the valve, cleaning all the parts, checking the seating surfaces. Bearings. Lapping the gate and seat for perfect blue matching, Reassembling the valve with new self sealing ring and gland packings.
Overhauling of GV 200 / 250 ATA M.O, GV 200 / 600 Class M.O, SCNRV 400,600mm/ 150 Class GV 500,600mm/ 150 Class. Dismantling the valve/NRV cleaning all the parts checking the seating surfaces and actuator bearings, Lapping the gate / seat / flap for perfect blue matching, Reassembling the valve with new self sealing ring / bonnet gasket and gland packings.
Overhauling of GV, GLV 200 / 40 ATA, HO/MO, SCNRV 250 / 300/ 40 ATA, Control valve 6" x 6" / 300 class, GV 250 / 40 ATA H.O, 2.5”, 4” / 150, 300 class. Dismantling the valve, cleaning all the parts, checking the seating surfaces and actuator bearings. Lapping the gate / seat / flap for perfect blue matching, Re-assembling the valve with new bonnet gaskets and gland packings.
Overhauling of GV 300/ 16 ATA MO, GV 300/40 ATA HO, GLV 200/ 40 ATA MO, Control valve 10 ” x 10" / 300 class Dismantling the valve, cleaning all the parts of the valve, checking the seating surfaces and actuator bearings. Lapping the gate / seat / disc / flap for perfect blue matching. Reassembling the valve with new bonnet gaskets and gland packings.
Overhauling of GV 200 / 64, 40, 16 ATA, GV 150/ 250 ATA MO. Dismantling the valve, cleaning all the parts, checking the gate / seat surfaces, Lapping the gate/seat for perfect blue matching. Reassembling the valve with new Self Sealing ring, gland packing’s rings without any leak, Checking the Actuator thrust base bearing and apply lubrication.
Overhauling of GV / GLV 2" class 800, 1500, 2500 HO/MO valves Dismantling the valve, cleaning all the parts, Lapping the gate, disc with seat, for perfect blue matching. Reassembling the valve with new bonnet gasket and gland packings.
Overhauling of GV/ GLV 1" class 800/1500/2500 HO/MO. Dismantling the valve, checking the seating surfaces. Cleaning all the parts. Lapping the disc with seat for perfect blue matching. Reassembling the valves with new gland packings and bonnet gaskets.
Overhauling of NRV 100/250 ATA , GLV 100 / 40 , 16 ATA, GLV 4” / 600, 300 class HO / MO , SCNRV 150/ 40, 16 ATA, SRV 2.5 ”X4 ” / 300 Class ,GV 350/125 class & GV 300/125 class, GV150/64 ATA HO, SCNRV 350/125 Class. Dismantling the valve, cleaning all the parts, checking the seating surfaces, bearing, yoke bush etc., Lapping the gate/ seat/ disc/flap for perfect blue matching. Reassembling the valve with new gland packing rings and bonnet gaskets without any leak. Checking the Actuator thrust base bearing and apply lubrication.
Gasket renewing for 150/200 mm valve, This work involves Removing the valve from line, Cleaning The flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts.
Gasket renewing for 250/300/350 mm valve, This work involves Removing the valve from line, Cleaning the flange surface on both sides, Preparation of gaskets for both ends, positioning the valve in the Line with gaskets and tightening the flange bolts & nuts.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .