| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC | ₹23.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹23.3 LRejected-AOC | ₹23.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | J Elango L2 | Mahadevi K L1 |
|---|---|---|---|---|---|
| 1.00Providing Drainage with coverslab in TNHB Sivan Kovil Road In Ayapakkam Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed | 190.8 | cu.m | 265 ₹50,562 | 263.7 ₹50,314 |
| 3.00 | Filling with M sand including cost and conveyance of all materials to site etc., complete | 31.8 | cu.m | 2,064 ₹65,635 | 2,062 ₹65,572 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple | 31.8 | cu.m | 5,785 ₹1.8 L | 5,783.5 ₹1.8 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing using mild steel sheets of size 90 x 60 cm for all labour charges etc | 960.2 | sqm | 549 ₹5.3 L | 547.4 ₹5.3 L |
| 6.00 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 2.01 | mt | 91,860 ₹1.8 L | 91,858.4 ₹1.8 L |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance and all labour charges etc. | 82.8 | sqm | 7,076 ₹5.9 L | 7,074.6 ₹5.9 L |
| 8.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance and all labour charges etc. | 30 | sqm | 9,507 ₹2.9 L | 9,505.3 ₹2.9 L |
| 9.00 | Cost and Supply of Man hole Cover SOR P-55 SLNO-238 | 50 | Nos | 1,866 ₹93,300 | 1,864 ₹93,200 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 3,55,743.36 ₹3.6 L | 3,55,353.3 ₹3.6 L |
Tender Value
₹23.6 L
EMD Value
₹58,875
Closing Date
20 Jan 2026, 3:00 pmClosed
Block Development Officer VP
Block Development Office VKM at Ambathur
Provding Drainagae with Cover Slab at TNHB Sivan Kovil Road in Ayapakkam Panchayat
2026_RDTN_644186_1
14TH FINANCE SAVING FUND 2025-26
Open Tender
Civil Works
90 days
Villivakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹58,875
Yes
7 Mar 2026
15 Jan 2026
20 Jan 2026
15 Jan 2026
20 Jan 2026
15 Jan 2026
Providing Drainage with coverslab in TNHB Sivan Kovil Road In Ayapakkam Panchayat
Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed
Filling with M sand including cost and conveyance of all materials to site etc., complete
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing using mild steel sheets of size 90 x 60 cm for all labour charges etc
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance and all labour charges etc.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance and all labour charges etc.
Cost and Supply of Man hole Cover SOR P-55 SLNO-238
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_771886.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
tenderdocument.pdf
Tender Documents • 0.76 MB
BOQ_771886.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid