Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance AKHADAPURA MOTH DISTT JHANSI | JHANSI | JHANSI | UTTAR PRADESH | ₹6.2 L | L1 | Accepted-Finance Low Rate |
| 2 | L2₹6.2 LRejected-Finance | ₹6.2 L | L2 | Rejected-Finance High Rate |
Updated dates
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
13 Apr 2026, 1:30 pmClosed
Executive Engineer
UPSCIDCO Jhansi
Vill. Chamaruaa Block Babina Janpad Jhansi me Sarv UP Gramin Bank ke samne Yatri Pratikshalaya ka nirman karya Under scheme B.V.N. 2025-26 Hon ble Shri Babulal Tiwari Ji, MLC Jhansi
2026_SCIDC_1132095_1
103/EE/Jhansi/ET/2025-26
Open Tender
Civil Works - Others
90 days
Vill. Chamaruaa Block Babina Jhansi
Please refer the tender documents
2 documents required · 2 mandatory
₹1,062
Yes
UPSCIDCO
₹12,500
Yes
2 May 2026
1 Apr 2026
13 Apr 2026
1 Apr 2026
13 Apr 2026
1 Apr 2026
1 Apr 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Yatri Pratikshalay | |||||
| 1.01 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 50 mt.& including filling, watering and ramming of excavated earth . dsr 2.6.1 | 1 | CUM | 1 | ₹1 |
| 1.02 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.. 2.25(A) | - | CUM | 0.8 | - |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | 0.8 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural
sources : 8 graded stone aggregate 40 mm nominal size.dsr 4.1.8 | 1 | CUM | 0.6 | ₹0.6 |
| 1.05 | Diluting and injecting chemical emulsion for POST CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration DSR 2023, 2.35.3.1 | - | SQM | 0.8 | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for : | - | SQM | 0.2 | - |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). sunshade SLAB ,DSR 5.3 | - | CUM | - | - |
| 1.08 | M. S. work in R.C.C. up to two floor lvl.Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeDSR 5.22.1 | - | Qtl | - | - |
| 1.09 | .Brick work with common burnt clay (non modular) bricks of class designation 150 in foundation and plinth in:Cement mortar 1:6 (1 cement : 4 coarse sand) 6.1.1 | 1 | CUM | 0.6 | ₹0.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.21 MB
chamaruanit.pdf
Tender Documents • 6.19 MB
BOQ_2112774.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid