Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Bidder has not uploaded Treasury Challan and also MOU not attested by First Class Magistrate. |
Tender Value
₹60.6 L
EMD Value
₹1.2 L
Closing Date
27 Apr 2026, 6:00 pmClosed
Executive Engineer RnB div Zainapora
Zainapora
Construction of Science Room, Computer Room and Library Room at HS Chitragam.
2026_PWDJK_307323_1
02/ZNP/RnB/e-Tendering/2026-27
Open Tender
Civil Works
Percentage
365 days
chitragam zainapora shopian
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer RnB div Zainapora
₹1.2 L
28 Apr 2026
4 Apr 2026
28 Apr 2026
4 Apr 2026
27 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | Cum | 1 | ₹1 |
| - | Providing and laying stone soling including ramming, hand packing and all carriages complete job in trenches, foundation etc. | - | cum | 0.6 | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Including cost of material involved complete. | 1 | Cum | 0.6 | ₹0.6 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)Including cost of material involved complete. | 1 | Cum | 0.6 | ₹0.6 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Including cost of material involved complete. | - | Cum | 0.8 | - |
| - | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 0.4 | - |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)Including cost of material involved complete. | 1 | Cum | 0.8 | ₹0.8 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete in sub-structure and super structure Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kgs | 0.8 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | 0.6 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. | - | sqm | 0.4 | - |
stage.html
html • 0.02 MB
finance_997133.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_997133.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .