| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 CrAdmitted-Finance | ₹22.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹23.5 CrAdmitted-Finance | ₹23.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹27.3 CrAdmitted-Finance | ₹27.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | WTE INFRA PROJECTS PVT LTD L1 | Aquatech Engineers L3 | marcuras water treatment (India) Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00nvitation of Quotation Notice for setting up of 500 KLD Leachate Treatment Plant at Moshi Kachara Depot, Pimpri Chinchwad Municipal Corporation on Design, Supply, Installation, Testing & Commissioning (DSITC) model as a part of Project of “Development of ISWM facility at Moshi Depot on DBFOT mode of PPP” Detailed Quotation Notice Attached | ||||||
| 1.01 | Design, Supply, Installation, Testing & Commissioning of 500 KLD Leachate Treatment Plant at Moshi Kachara Depot including All the required machineries / equipment as per ISO/BIS standards, The Pumps of Good quality and required Capacity of Brand like ABB, KSB, Crompton, Kirloskar or Equivalent. The treated Leachate water should fulfil the MSW 2016 Rules / CPCB/ MPCB/ NGT discharge norms as given in MSW 2016 rules and as amended time to time. Leachate Collection Tank should be leak proof of RCC / HDPE lined with overflow provision, Oil & grease system comply with IS 10537 for removal of floating matter, pH correction tank along with alkali or acid dosing system and monitored in line with automatic sensors. Chemicals should managed in accordance with MSDS (Material Safety Data Sheets) / SDS (Safety Data Sheets). Diffused aeration with DO sensors and online monitoring. Real-time BOD, COD, pH, TSS monitoring system as per MPCB directions & Telemetry connection should be provided. Data must be stored on site for minimum 3 Months -
Detailed Quotation Notice Attached | 1 | Per No | 22,40,00,000 ₹22.4 Cr | 27,10,00,000 ₹27.1 Cr | 23,30,00,000 ₹23.3 Cr |
| 1.02 | The Operation and Maintenance (O&M) scope for a 500 KLD Leachate Treatment Plant (LTP) in accordance with the MSW 2016 Rules and CPCB/MPCB discharge standards includes daily operations include regular functioning of all treatment units such as the collection tank, equalization tank, oil and grease separator, pH neutralization unit, biological treatment/SBR units, membrane/RO systems, and sludge drying beds or filter press. Continuous monitoring—both online and manual—of flow and quality parameters (like BOD, COD, TSS, pH, NH₃-N, and toxicity) must be maintained, along with shift-wise operation logbooks.-
Detailed Quotation Notice Attached | 1 | Per Month | 20,00,000 ₹20 L | 23,00,000 ₹23 L | 22,00,000 ₹22 L |
Tender Value
Refer Docs
Closing Date
30 Jul 2025, 3:00 pmClosed
Ex Engineer (ENV) PCMC
PCMC Main Building
Invitation of Quotation Notice for setting up of 500 KLD Leachate Treatment Plant at Moshi Kachara Depot, PCMC on DSITC model as a part of Project of Development of ISWM facility at Moshi Depot on DBFOT mode of PPP
2025_PCMCP_1203403_1
Quotation Notice- ENV/25/2025-26
Open Tender
Civil Works - Others
180 days
PCMC area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
21 Aug 2025
23 Jul 2025
1 Aug 2025
23 Jul 2025
30 Jul 2025
23 Jul 2025
Amount
nvitation of Quotation Notice for setting up of 500 KLD Leachate Treatment Plant at Moshi Kachara Depot, Pimpri Chinchwad Municipal Corporation on Design, Supply, Installation, Testing & Commissioning (DSITC) model as a part of Project of “Development of ISWM facility at Moshi Depot on DBFOT mode of PPP” Detailed Quotation Notice Attached
Design, Supply, Installation, Testing & Commissioning of 500 KLD Leachate Treatment Plant at Moshi Kachara Depot including All the required machineries / equipment as per ISO/BIS standards, The Pumps of Good quality and required Capacity of Brand like ABB, KSB, Crompton, Kirloskar or Equivalent. The treated Leachate water should fulfil the MSW 2016 Rules / CPCB/ MPCB/ NGT discharge norms as given in MSW 2016 rules and as amended time to time. Leachate Collection Tank should be leak proof of RCC / HDPE lined with overflow provision, Oil & grease system comply with IS 10537 for removal of floating matter, pH correction tank along with alkali or acid dosing system and monitored in line with automatic sensors. Chemicals should managed in accordance with MSDS (Material Safety Data Sheets) / SDS (Safety Data Sheets). Diffused aeration with DO sensors and online monitoring. Real-time BOD, COD, pH, TSS monitoring system as per MPCB directions & Telemetry connection should be provided. Data must be stored on site for minimum 3 Months - Detailed Quotation Notice Attached
The Operation and Maintenance (O&M) scope for a 500 KLD Leachate Treatment Plant (LTP) in accordance with the MSW 2016 Rules and CPCB/MPCB discharge standards includes daily operations include regular functioning of all treatment units such as the collection tank, equalization tank, oil and grease separator, pH neutralization unit, biological treatment/SBR units, membrane/RO systems, and sludge drying beds or filter press. Continuous monitoring—both online and manual—of flow and quality parameters (like BOD, COD, TSS, pH, NH₃-N, and toxicity) must be maintained, along with shift-wise operation logbooks.- Detailed Quotation Notice Attached
marcuras water treatment (India) Pvt Ltd (BID ID -6798784)
Aquatech Engineers (BID ID -6798210)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid