| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC PLOT NO 63 CHERAN COLONY K CHETTIPALAYAM MUTHANAMPALAYAM TIRUPUR | TIRUPUR | TIRUPUR | TAMIL NADU | ₹10.7 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹11.0 LRejected-AOC | ₹11.0 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | SRISAIHARI CONSTRUCTIONS L2 | G.Kanagaraj L1 |
|---|---|---|---|---|---|
| 1.00NAME OF WORK: 1.Strengthening the road from Bright Garden @Myleripalayam H/o, Myleripalayam panchayat. | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. Km 0/0 - 1/480 | 342 | sqm | 10 ₹3,420 | 6.3 ₹2,154.6 |
| 3.00 | Picking the existing Mettaled surface and sectioning including all labour charges etc, complete. | 356.25 | sqm | 25 ₹8,906.25 | 23 ₹8,193.75 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 160.31 | Cum | 2,600 ₹4,16,806 | 2,562.8 ₹4,10,842.47 |
| 5.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,068.75 | sqm | 90 ₹96,187.5 | 85.3 ₹91,164.38 |
| 6.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 1,068.75 | sqm | 25 ₹26,718.75 | 19.7 ₹21,054.38 |
| 7.00 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 32.06 | Cum | 11,125 ₹3,56,667.5 | 11,119.75 ₹3,56,499.19 |
| 8.00 | Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. | 64.13 | Cum | 150 ₹9,619.5 | 147 ₹9,427.11 |
| 9.00 | Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and informatory signs (without definition board) including all charges etc., 60 cm equilaterial triangle | 1 | Nos | 5,000 ₹5,000 | 4,999 ₹4,999 |
| 10.00 | Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete | 1 | Nos | 580 ₹580 | 574.6 ₹574.6 |
Tender Value
₹10.9 L
EMD Value
₹10,900
Closing Date
4 Feb 2026, 3:00 pmClosed
Special Officer/BDO(VP), Madukkarai
Block Development Officer (VP), Palakkadu Main Road, Madukkarai -641105
Strengthening the road from Bright Garden at Myleripalayam H.o.Myleripalayam Panchayat
2026_RDTN_647770_1
Roc.No.37/2026 Date.23.01.2026 DTCP PKG 1
Open Tender
Civil Works
Madukkarai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,900
Yes
9 May 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. Km 0/0 - 1/480
Picking the existing Mettaled surface and sectioning including all labour charges etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508.
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc.
Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and informatory signs (without definition board) including all charges etc., 60 cm equilaterial triangle
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Lettering and painting of Name board cum Citizen Board including painting and lettering as directed by the departmental officers etc., complete
Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.74 MB
technicalbid1090000.pdf
Tender Documents • 0.83 MB
pricebid1090000.pdf
Tender Documents • 0.89 MB
BOQ_776573.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid