| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹33.2 LAccepted-Finance ADD 86 NEAR MAHILA DAK BANGLA RAOD SADAR LAIN BAZAR KANHAIPUR DISTRICT JAUNPUR | KANHAIPUR | JAUNPUR | UTTAR PRADESH | ₹33.2 L | 1st | Accepted-Finance L-1 |
| 2 | 2nd₹36.8 LAccepted-Finance | ₹36.8 L | 2nd | Accepted-Finance L-2 |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
24 Jul 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE CUM SHOPPING COMPLEX JAWAHAR NAGAR BHELUPUR VARANASI
CONSTRUCTION WORK INVOLVING A DRAINAGE SYSTEM, INTERLOCKING ROAD, AND RCC SLAB FROM NEXT TO THE VIKAS BHAWAN TO THE DISTRICT PANCHAYAT OFFICE IN HUSAINABAD WARD, DISTRICT JAUNPUR UNDER INFRASTRUCTURE FUND
2026_UPHDB_1168203_1
1518/M-11/506 DT. 09.07.2026
Open Tender
Civil Works
Fixed-rate
180 days
HUSAINABAD, DISTRICT JAUNPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
EXECUTIVE ENGINEER CD VARANASI-02 UPAVP VARANASI
₹74,000
6 Aug 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all T&P. Sl no.- 251 | 294.48 | Cum | 130 | ₹38,282.4 |
| 2 | Concrete with 4cm gauge approved stone ballast approved coarse sand and cement-in the proportion of 8:4:1 including-supply of all materials labour and tools and plants etc. required for proper completion for the work. | 12.42 | Cum | 5,550 | ₹68,931 |
| 3 | Brick work with comon bumt clay (non modular) bricks of class M-150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 Coarse sand)DSR6.1.1AR | 47.2 | Cum | 7,407.19 | ₹3,49,619.37 |
| 4 | 12 mm thick plaster with cement mortar consisting of 1part cement and 4 part of approved coarse sand . Minimum thickness not be less than 10 mm including supply of all materials , labour and T & P etc. required for proper completion of work with cement and sand of 1.25 fineness modulus.SOR-584 | 203.4 | Sqm | 165 | ₹33,561 |
| 5 | Providing and laying in Cement concrete 1:2:4 (1Cement:2 find sand :4 graded stone ballast 20mm approve coarse sand and cement in the proportion incluidng supply of all materials lobour and T&P etc. required for proper completion of the work. | 4.14 | Cum | 7,100 | ₹29,394 |
| 6 | Disposal of excavated surplus earth upto 5km distance including loading, unloading, cartage etc complete including all labour and T&P etc. required for proper completion of the work | 206.14 | Cum | 183.5 | ₹37,826.69 |
| 7 | INTERLOCKING : Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (W.M.M.) specification including premixing the material with water at OMC for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge of the work. | 268.8 | Cum | 3,152.4 | ₹8,47,365.12 |
| 8 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in SLAB and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour & T and P etc, required for proper completion of the works. strength of the concrete shall not beless than M-20.PWD-288B | 21.6 | cum | 9,100 | ₹1,96,560 |
| 9 | Mild steel or iron in plan work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level.. DSR5.22.6 | 16.96 | QTL | 7,926.98 | ₹1,34,441.58 |
| 10 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in SLAB and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour & T and P etc, required for proper completion of the works. strength of the concrete shall not beless than M-20.PWD-288B | 2,337.28 | Cum | 835 | ₹19,51,628.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
TH.pdf
Tender Documents • 9.43 MB
FH.pdf
Tender Documents • 1.77 MB
BOQ_2191208.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].