| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹1.6 L (1.35%)Rejected-Finance | ₹1.2 Cr+₹1.6 L (1.35%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
10 May 2023, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Maduraii District Kottampatti Block Renewal of Road under MGSMT 2022-202 Package No TN MDU-KOTT--05
2023_RDTN_308590_3
735/2023/D6/KOTT05
Open Tender
Civil Works
Item Rate
180 days
Kottampatti
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.2 L
11 Jul 2023
5 May 2023
10 May 2023
5 May 2023
10 May 2023
6 May 2023
Amount
Renewal BT of Nallasukkampatti to Singampunari Junction via Chockkakilavanpatti road Km 0/0 -4/10 (R-32)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and Laying US Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Construction of 5.00m span 2 vent minor bridge @ Ch -20m
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with exc
Cement concrete 1:4:8 mix using 40mm HBG metal including all cost and conveyance of all materials and labours charges etc., complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Centering and shuttering for RCC work in plain surfaces including all cost and conveyance of all material using mild steel angles of size 25mmx25mmx3mm with 10 guage sheets of size 10cmx60cm welded frame for boarding laid over silver oak joist of size 5cm
A) Below GL
B) Above GL
Plain Cement concrete 1:3:6 using 40mm ISS HBG metal for all including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be fi
Reinforcement cement concrete 1:1.5:3 mix using 20mm graded HBG metal including all cost and conveyance of materials and labour charges etc., complete
Supply and fixing of 63 mm PVC Pipe for Wheep Holes
Supply and fixing of Tar Pad 20 mm Thick Inculding all Charges Etc.Complete
Providing and laying of Carted earth Filling including all cost and conveyance of materials and labour charges etc., complete
Providing and laying of Us Gravel Filling including all cost and conveyance of materials and labour charges etc., complete
Provision for Name board Charges & Citizen information etc Complete
Provision for Equilateral Triangle Cautionary Signboard Charges
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Road Marker / Road Stud With Lens Reflector
Renewal BT of Nallasukkampatti to Singampunari Junction via Chockkakilavanpatti road Km 0/0 -4/10 (R-32)
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M A BAHADURKHAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .