| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC NO 2 MANIKANDAPURAM THIRUMULLAIVOYAL CHENNAI 600062 | THIRUVALLUR | TAMIL NADU | 600062 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 CrRejected-AOC NO 12 VANIGA VALAGAM 1ST MAIN ROAD NAGANALLUR CHENNAI 600 061 | CHENNAI | TAMIL NADU | 600061 | ₹1.6 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | TAMILNADU CHEMICALS INDUSTRIES L1 | V.B.ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 1,591 | m3 | 7,465.5 ₹1.2 Cr | 7,469 ₹1.2 Cr |
| 2.00 | Advance Patches Cement Concrete 1:4:8 (One cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 50 | m3 | 5,620 ₹2.8 L | 5,622 ₹2.8 L |
| 3.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 279 | m2 | 478.5 ₹1.3 L | 480 ₹1.3 L |
| 4.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 4,118 | m2 | 30.8 ₹1.3 L | 32 ₹1.3 L |
| 5.00 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 206 | m3 | 10,618 ₹21.9 L | 10,745 ₹22.1 L |
| 6.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 124 | m3 | 11,192 ₹13.9 L | 11,925 ₹14.8 L |
Updated dates
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
28 Jan 2026, 3:00 pmClosed
The Commissioner
Thirunindravur Municipaity
Relaying of Cement Concrete Road to Kottai Road 184023R099, Mandapam Road 184023R098,Mandapam Street and palla Street Link Street 184023S508, Thirumurugan Nagar 1st Road 184023R096,in Thirunindravur Municipality. Package 3
2026_MAWS_642888_1
777/2025/E1
Open Tender
Civil Works
Thirunindravur Municipaity
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.9 L
Thirunindravur Municipaity
9 Feb 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
14 Jan 2026
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Advance Patches Cement Concrete 1:4:8 (One cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 0.82 MB
BOQ_770267.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid