Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.6 CrAccepted-AOC R 25 RESHIMBAGH UMRED ROAD NAGPUR 440 009 | NAGPUR | NAGPUR | MAHARASHTRA | 440009 | ₹97.6 Cr Quoted ₹102.7 Cr | L1 | Accepted-AOC Award of Contract, Bidder is L1 |
| 2 | L2₹107.0 Cr+₹4.3 Cr (4.21%)Rejected-AOC 1148 E SYKES EXTENSION KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | ₹107.0 Cr+₹4.3 Cr (4.21%) | L2 | Rejected-AOC Bidder is L2 |
| 3 | Rejected-Technical SP SADAN BEHIND CHOTI MASJID GANDHI CHOWK SADAR NAGPUR 440001 | NAGPUR | NAGPUR | MAHARASHTRA | 440001 | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹98.2 Cr
EMD Value
₹49.1 L
Closing Date
10 Jul 2025, 5:45 pmClosed
EXECUTIVE ENGINEER
Office of EXECUTIVE ENGINEER, AMBHORA LIFT IRRIGATION, DIVISION, BHIWAPUR (TAS)
Construction Execution of Micro Irrigation Scheme for Sonegaon Stage I RD 20580 M on Wadala Branch of Mokhabardi Lift Irrigation Scheme for irrigation of 1718 Ha. Culturable Command Area (CCA) with pipe distribution network and micro irrigation syste
2025_CEWRD_1194326_1
Tender Notice No 01/2025-26
Open Tender
Civil Works - Canal
Percentage
730 days
Mokhabardi Lift Irrigation
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹49.1 L
23 Mar 2026
26 Jun 2025
14 Jul 2025
26 Jun 2025
10 Jul 2025
26 Jun 2025
26 Jun 2025 - 3 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction Execution of Micro Irrigation Scheme for Sonegaon Stage I RD 20580 M on Wadala Branch of Mokhabardi Lift Irrigation Scheme for irrigation of 1718 Ha. Culturable Command Area (CCA) with pipe distribution network and micro irrigation system including Survey, Planning, Design of entire scheme with construction of pump house, pumping machinery, all mechanical electrical works, automation of entire system, formation of WUA training to the farmers as per MMISF Act 2005 and 5 year operation maintenance of the entire Scheme. | 1 | Work | 98,19,18,453 | ₹98,19,18,453 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_2069809.xls
BOQ • 0.32 MB
174110519.pdf
Tender Documents • 0.70 MB
174110521.html
Tender Documents • 0.05 MB
SonegaonDTP.pdf
Tender Documents • 7.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .