Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC Bid Stands L1 |
| 2 | L2₹3.1 L+₹7,817 (2.60%)Rejected-AOC | ₹3.1 L+₹7,817 (2.60%) | L2 | Rejected-AOC Bid Stands L2 |
| 3 | L3₹3.3 L+₹27,751 (9.23%)Rejected-AOC | ₹3.3 L+₹27,751 (9.23%) | L3 | Rejected-AOC Bid Stands L3 |
| 4 | L4₹3.6 L+₹55,224 (18.4%)Rejected-AOC | ₹3.6 L+₹55,224 (18.4%) | L4 | Rejected-AOC Bid Stands L4 |
| 5 | L5₹3.7 L+₹69,377 (23.1%)Rejected-AOC NEWTOWN ALIPURDUAR | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | ₹3.7 L+₹69,377 (23.1%) | L5 | Rejected-AOC Bid Stands L5 |
Tender Value
₹4.6 L
EMD Value
₹9,250
Closing Date
23 Jul 2026, 6:55 pmClosed
Exe. Engineer, Alipurduar Highway Division
O/o. the Exe. Engineer, Alipurduar Highway Division, P.W.(R)Dte., Manna Dey Street, College Halt, Alipurduar - 736 122
Half-Yearly maintenance work of 20nos. Bridges and Local natural streams/channels crossing different roads under Kalchini Highway Section and Other allied works under the Alipurduar Highway Division in the district of Alipurduar
2026_WBPWD_5016427_3
WBPWD(R)/AHD/EE/NIT- 02(e)(2nd Call)/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
Kalchini Highway Section
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,250
Yes
1 Sept 2026
9 Jul 2026
27 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Section-II, Materials and Labour, Item no. 1.00 (B) Labour Rate as per Diem, Vide Page- 302303, of S.O.R. 2017, Volume-I, (Building) and latest
Mazdoor (Male) (For the work of cleaning 20nos. different bridges and culverts by removing dirt and debrises due to deposition of sand, silt and earth etc. cleaning drainge of rain water, cleaning unwanted growth of vegetation on bridge structure and any such other kind of works as may be directed by the Engineer-in-Charge to keep the cross drainage structure fit for public use during the maintenance tenure.) | 1,440 | nos. | 269.5 | ₹3,88,080 |
| 2 | Add GST @ 18% on Rs. 03,88,080.00 i.e. total amount over item no. 1 to 01 | 3,88,080 | % | 18 | ₹69,85,440 |
| 3 | Add Labour Welfare Cess @ 1% of Rs. 04,57,934.40 i.e. total amount Item No. 1 to 02 | 4,57,934.4 | % | 1 | ₹4,57,934.4 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 0.52 MB
Tendernotice_4.pdf
PDF • 0.90 MB
BOQ_5085925.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .