Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹6.9 L Quoted ₹5.8 L | L1 | Accepted-AOC TC recommendation |
| 2 | Rejected-Technical S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | HAREKRISHNA ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Taking final measurements from installed drum lagging, Fabrication of new wooden lagging as per fitting size manually. | 1 | LS | 29,305.54 ₹29,305.54 |
| 3.00 | Dismantling of both sides winding rope from winding engine drum (with necessary arrangements), placing the ropes at safe place etc. | 1 | LS | 17,428.69 ₹17,428.69 |
| 4.00 | Dismantling of old and assembling of new Drum laggings in winding drum | 1 | LS | 35,078.28 ₹35,078.28 |
| 5.00 | Carrying of old and used wooden lagging from winding engine room to colliery store | 1 | LS | 11,545.5 ₹11,545.50 |
| 6.00 | 20mm x 180mm long hole making in all drum lagging manually or through electrically operated machine | 1 | LS | 8,769.57 ₹8,769.57 |
| 7.00 | Fitting of both side winding rope, testing and trial run of same and adjusting the elongation of both ropes thrice within 10 days time of lagging fitting, testing and trial run. | 1 | LS | 20,425.52 ₹20,425.52 |
| 8.00 | Supply of Sal wood drum lagging of size 72”x6”x6” for replacement | 48 | nos | 8,888 ₹4.3 L |
| 9.00 | Supply of 16mm/M16 x 200mm long half thread HT bolt | 96 | nos | 286 ₹27,456 |
| 10.00 | Supply of 16mm/M16 HT Nylok Nut (Nylon ring Insert)Duly White zinc Plated for drum lagging | 96 | nos | 57.2 ₹5,491.20 |
Tender Value
₹6.9 L
EMD Value
₹8,600
Closing Date
10 Jul 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
complete replacement of wooden drum lagging in Pit no.3 winder at Shyamsundarpur colliery under Bankola area
2025_ECL_338629_1
ECL/GM/BA/E TENDER/25-26/ENT/13 Dt 30.06.2025
Open Tender
Electrical and Maintenance Works
15 days
Shyamsundarpur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,600
8 Apr 2026
30 Jun 2025
11 Jul 2025
30 Jun 2025
10 Jul 2025
30 Jun 2025
30 Jun 2025 - 3 Jul 2025
Amount
Item Description/ Heading
Taking final measurements from installed drum lagging, Fabrication of new wooden lagging as per fitting size manually.
Dismantling of both sides winding rope from winding engine drum (with necessary arrangements), placing the ropes at safe place etc.
Dismantling of old and assembling of new Drum laggings in winding drum
Carrying of old and used wooden lagging from winding engine room to colliery store
20mm x 180mm long hole making in all drum lagging manually or through electrically operated machine
Fitting of both side winding rope, testing and trial run of same and adjusting the elongation of both ropes thrice within 10 days time of lagging fitting, testing and trial run.
Supply of Sal wood drum lagging of size 72”x6”x6” for replacement
Supply of 16mm/M16 x 200mm long half thread HT bolt
Supply of 16mm/M16 HT Nylok Nut (Nylon ring Insert)Duly White zinc Plated for drum lagging
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_351034.pdf
BOQ Comparative Chart
xlsx
finsummary_351034.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.22 MB
BOQ_351034.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid