Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance AL NUAGAON GP BADAMBILA PO NAMAUZA PS AUL DIST KENDRAPARA PIN 754231 | KENDRAPARA | ODISHA | 754231 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance AT NARANPARA PO CHANDOL PS KENDRAPARA SADAR DIST KENDRAPARA PIN 754208 | KENDRAPARA | ODISHA | 754208 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.0 L
EMD Value
₹13,100
Closing Date
11 May 2026, 5:00 pmClosed
Divisional Officer
ROADS and BUILDING DIVISION NO. II, KENDRAPADA
Re Construction of NH-53 side collapsed compound wall of Government Polytechnic Building, Kendrapara for the year 2025-26
2026_EICCL_128532_1
S.E RnB KPD-II-01 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Kendrapara
2 documents required · 2 mandatory
₹6,000
₹13,100
Yes
12 May 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
30 Apr 2026 - 2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonry in lime or cement mortar under 3.0M height including stacking the usefull materials for reuse and removing the debris within 50 M lead. | 5.83 | cum | 1,611.74 | ₹9,396.44 |
| 2 | Construction of Single under reamed pile foundation of 300mm dia and 4.00 mtr long with RCC M20 grade using 20mm and down grade black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel but including the cost of labour, conveyance, taxes, royalty, etc. all complete as per the direction of engineer-in-charge. | 28 | Nos | 4,424.9 | ₹1,23,897.2 |
| 3 | Earth work in Hard Soil or Gravelly Soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of Engineer-in-charge | 26.4 | cum | 276.89 | ₹7,309.9 |
| 4 | Supplying, filling in foundation and plinth with sand including watering and ramming, poking & compacting including cost, conveyance, royalties, taxes of the materials and cost of all labour, labour cess, T&P etc. required for the work complete. | 8.07 | cum | 811.05 | ₹6,545.17 |
| 5 | Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including the cost of all materials, cost of labour, conveyance, taxes, royalties, loading, unloading, curing, labour cess, T&P, etc. all complete as per the direction of Engineer-in-charge. | 5.38 | cum | 6,487.49 | ₹34,902.7 |
| 6 | RCC work of M-20 grade including cost of centering and shuttering using 20mm and down grade size black hard granite (Crusher Broken) chips of approved quality from approved quary including the cost of all materials, cost of all labour, conveyance, taxes, loading, unloading, T&P, royalty, labour cess, all complete as per the direction of Engineer-in-charge but excluding the cost of steel reinforcement.
Pile cap | 7.09 | cum | 7,011.11 | ₹49,708.77 |
| 7 | Grade beam | 7.31 | cum | 7,881.46 | ₹57,613.47 |
| 8 | Column | 1 | cum | 18,682.96 | ₹18,664.28 |
| 9 | RCC band | - | cum | 14,674.43 | - |
| 10 | Cutting, Straightening, coiled or bent up MS Rod of TOR steel using SAIL/RINL /TATA /JINDAL /SHYAM Steel including bending, binding,welding and joining if necessary and tying the grills and placing in position as required for RCC work and hoisting, lowering laying icluding cost, conveyance, taxes of MS rod or TOR steel and binding wire of 18 to 20 gauge and labour required for the work for bending,binding and tying the grills etc. complete. | 1 | Qtl | 9,495.07 | ₹9,485.57 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.88 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_588961.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .