Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹29,395.79 (21.2%)Admitted-Fee/PreQual/Technical/Finance AT PO DUGDA DIST BOKARO JHARKHAND 828404 | BOKARO | JHARKHAND | 828404 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.7 L+₹33,820.16 (24.4%)Admitted-Fee/PreQual/Technical/Finance DUGDA BOLARO | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹1,900
Closing Date
22 Sept 2026, 5:00 pmClosed
ACE/DCW
Office of ACE/DCW, Saraidhela, Dhanbad, Jharkhand - 828127
Construction / maintenance of buildings
2026_BCCL_365330_1
BCCL/DCW/CIVIL/Ten/ 26-27/03
Open Tender
Civil Works - Others
Percentage
21 days
Dugda Coal Washery
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,900
23 Sept 2026
12 Sept 2026
23 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
12 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | White washing with lime to give an even shade :Old work (one or more coats) | 705.36 | sqm | 8.95 | ₹6,312.97 |
| 1.02 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 564.28 | sqm | 12.05 | ₹6,799.57 |
| 1.03 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3,759.25 | sqm | 5.35 | ₹20,111.99 |
| 1.04 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3,759.25 | sqm | 10.5 | ₹39,472.13 |
| 1.05 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 751.85 | sqm | 20.4 | ₹15,337.74 |
| 1.06 | AR OF BLEACHING POWDER SUPPLY | 4,225 | sqm | 2.47 | ₹10,435.75 |
| 1.07 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 30 | cum | 154.9 | ₹4,647 |
| 1.08 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 20 | sqm | 68.3 | ₹1,366 |
| 1.09 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) | 50 | sqm | 288.25 | ₹14,412.5 |
stage.html
html • 0.02 MB
finance_378260.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.32 MB
BOQ_378260.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .