| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC UPPER MANGWAIN 272 11 MANGWAIN MANDI HIMACHAL PRADESH 175001 | MANDI | HIMACHAL PRADESH | 175001 | ₹2.4 Cr | L1 | Accepted-AOC L1 Lowest bid Accepted and L2 Highest bid Rejected |
| 2 | L2₹2.7 CrRejected-Finance | ₹2.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.7 CrRejected-Finance | ₹2.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.3 CrRejected-Finance D 80 JANAKPURI SAHIBABAD DIST SHAZABAD | SONBHADRA | UTTAR PRADESH | 231207 | ₹3.3 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.3 CrRejected-Finance 249 SHALIMAR SHAMLI | SHAMLI | SHAMLI | UTTAR PRADESH | ₹3.3 Cr | L5 | Rejected-Finance L5 |
Tender Value
₹3.3 Cr
EMD Value
₹18.4 L
Closing Date
15 Dec 2025, 2:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Construction work of Sisana to Baghpat Sugar Mill Baghu Road (Industrial Area) in Baghpat district in the financial year 2025-26
2025_CEMRT_1097407_1
5263/11Cashier-MC PD Baghpat Dt 15-11-25
Open Tender
Civil Works
365 days
EE PD PWD BAGHPAT
CLASS A
3 documents required · 3 mandatory
₹2,714
₹18.4 L
SE MEERUT CIRCLE PWD MEERUT
16 Feb 2026
8 Dec 2025
15 Dec 2025
8 Dec 2025
15 Dec 2025
8 Dec 2025
9 Dec 2025
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removaland disposal of top organic. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Construction of Embankment/Patri with Material obtained from Borrowpits. Cartage 2.00 km Construction of embankment/patri with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For grading-I Material. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and applying primer coat with SS1 bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and laying dense graded bituminous macadam batch with type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 557 complete in all respects. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.2 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. ( Bitumen VG-30). Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Brick masonry work in 1:3 in sub- tructure complete excluding pointing and plastering, as per drawing and Technical Specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and laying reinforced cement concrete 350mm Dia NP3 pipe for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works, backfilling concrete and masonary work in head wall and parapets clause 1106. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and laying reinforced cement concrete 600mm Dia NP3 pipe for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works, backfilling concrete and masonary work in head wall and parapets clause . Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) required for proper completion of work as per direction of Engineer-in-Charge. SI No. 692. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Dismantling reinforced cement concrete or reinforced brick work including stacking of materials (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). SI No. 694. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
PCC Grade M15 Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
PCC Grade M20 Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
RCC Grade M20 Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Dewatering. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Supply and fixing of 10cm. (4") internal dia for 10.0 cm. PVC down pipe Everest or charminar make complete with bends with door at top and plain at bottom and grantings and including supply of neary M.S. clamp 2.5cm x 3 mm. (1" x1/8") fixed to walls with cement motar (1:2) and including supply of 15 cm (6") long 6mm. (1/4") dia nail all materials, labour and T& P. etc. required for proper completion of the work and also including repair of plaster pointing etc. if damaged during fixing of the pipes. Including cost of all material labour T&P etc (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) required for proper completion of work as per direction of Engineer-in-Charge. SI No. 730a. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. (660) but for each coat of water proof cement paint after the first two coat to give an even shade. (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) DSR SI.No. 13.44.1. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Supply and fixing of 10cm. (4") internal dia MS Drain Pipe including grating all material, labour all taxes etc. complete. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
16.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Construction of Embankment/Patri with Material obtained from Borrowpits. Cartage 2.00 km. Construction of embankment/patri with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Brick soling with strainght over burnt bricks laid flat and dry with brick edging on both sides including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth of P.I. 5 to 7, spreading blinding coat 1 cm (3/8") depth of local earth over the entire surface and including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. As in item No. 762(a) above but with bricks laid on edge. SI No. 762(B). Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Supply of 1000mm dia NP-3 Class hume pipe. All Material, Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST). SI No. New Item Chp-1. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per d
irection of Engineer-in-charge.
Laying of 1000 mm dia NP-3 hume pipe in position ( Labor only) including labour and T & P etc. required for completion of the work. ( SI No. 10.27). All Material, Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST). Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and Fixing of Km. Stone. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
Providing and Fixing of Hecto meter stone. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 13.37 MB
BOQ_2020653.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid