| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-Finance | ₹36.8 L | L1 | Accepted-Finance low |
| 2 | L2₹36.8 LRejected-Finance | ₹36.8 L | L2 | Rejected-Finance high |
| Sl No | Description | Qty | Unit | R SURESH L1 | BALAKUMAR R L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of TWO Class Room Building at T.Murungappatti PUE School in Thalugai Panchayat.Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 146 | cum | 246.27 ₹35,955.42 Lowest | 246.5 ₹35,989 |
| 2.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 19.32 | cum | 1,979 ₹38,234.28 Lowest | 1,979 ₹38,234.28 Lowest |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 18.96 | cum | 5,504 ₹1,04,355.84 Lowest | 5,505 ₹1,04,374.8 |
| 4.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 97.18 | cum | 42.8 ₹4,159.3 Lowest | 45 ₹4,373.1 |
| 5.00 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 112.06 | cum | 222.1 ₹24,888.53 Lowest | 225 ₹25,213.5 |
| 6.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 75.39 | sqm | 516 ₹38,901.24 Lowest | 520 ₹39,202.8 |
| 7.00 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 190.63 | sqm | 1,033 ₹1,96,920.79 | 1,032.5 ₹1,96,825.48 Lowest |
| 8.00 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 137.27 | cum | 1,033 ₹1,41,799.91 | 1,032.5 ₹1,41,731.28 Lowest |
| 9.00 | Providing and laying in position, M-20 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials). | 30.65 | cum | 9,315 ₹2,85,504.75 | 9,310.9 ₹2,85,379.09 Lowest |
| 10.00 | Ground Floor | 29.85 | cum | 9,447.4 ₹2,82,004.89 | 9,442.7 ₹2,81,864.6 Lowest |
Tender Value
₹37.2 L
EMD Value
₹38,000
Closing Date
16 Jul 2025, 3:00 pmClosed
Block Development Officer(BPts)
Block Development Officer(BPts), Panchayat Union Office Uppiliyapuram
Construction of TWO Class Room Building at T.Murungappatti PUE School in Thalugai Panchayat
2025_RDTN_581106_1
A2/1886/2024 Dated 01.07.2025
Open Tender
Civil Works - Buildings
Item Rate
30 days
Uppiliyapuram
PleaseReferDocuments
5 documents required · 5 mandatory
₹0
₹38,000
Yes
17 Jun 2026
12 Jul 2025
16 Jul 2025
12 Jul 2025
16 Jul 2025
12 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].