| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC IDGHA COLONY LAKKAR BAZAR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.7 L+₹36,856 (3.25%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹11.9 L+₹52,808 (4.66%)Rejected-Finance VILLAGE BANDLI P O KANDO BHATNOL TEHSIL SHILLAI DISTRICT SIRMOUR H P | BANDLI | SIRMOUR | HIMACHAL PRADESH | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹12.4 L+₹1.0 L (9.11%)Rejected-Finance SHARMA NIWAS GHORA CHOWKI TEHSIL DISTT SHIMLA HP | SHIMLA | SHIMLA | HIMACHAL PRADESH | L4 | Rejected-Finance Due to L4 | |
| 5 | L5₹12.4 L+₹1.1 L (9.69%)Rejected-AOC BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L5 | Rejected-AOC L5 |
Tender Value
₹14.7 L
EMD Value
₹29,340
Closing Date
22 Mar 2022, 5:00 pmClosed
E. E. SHIMLA DIVISION NO. III, HPPWD, Shimla-3
E. E. SHIMLA DIVISION NO. III, HPPWD, Shimla-3
Widening of turning point of Cart road to Mall road at Chotta Shimla SH Cutting work alongwith construction of 32.00mtre C.C. Breast wall etc. under Smart City project
2022_PWD_58112_2
33744-61dt.10-3-2022
Open Tender
Civil Works - Roads
Item Rate
90 days
Chotta Shimla
As per SBD
11 documents required · 11 mandatory
₹500
Yes
₹29,340
13 Apr 2022
16 Mar 2022
23 Mar 2022
16 Mar 2022
22 Mar 2022
16 Mar 2022
Amount
Cutting in earth work in all heights / depths and in all kinds of soil such as kankar, moorum, shingle and decomposed or soft rock and hard rock including their intermediate classification and chiselling / wedging out rock where blasting is prohabited including saturated soil and filling in embankment etc., where necessary and disposal of all excavated un serviceable materials in all leads and lifts including through mechanical transporation, the disposal of unserviceable materials will be done in acquired width of the road or on approved dumping site.
Providing form work with steel plates 3.15mm (Three point fifteen milimetre) thick welded with angle iron in frame 30mm X 30mm x 5mm (Thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden/ steel battens and ballies, height of propping and centring below supporting floor to ceiling to any floor height and removal of the same for in situ-reinforced concrete and plain concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge:- Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like.
Providing and laying cement concrete 1:5:10 (1 cement : 5 Sand :10 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in Foundation and plinth including carriage of materials within all leads and lifts and upto all floor levels.
Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm nominal size) and curing complete excluding cost of centring and shuttering including carriage of materials in all leads and lifts in foundations and plinth.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 including carriage of materials within all leads and lifts as per direction of Engineer-in-charge.
Stone filling behind retaining wall per HP.PWD specification 1990 Volume - I and as per direction of the Engineer-in charge.
Stone soling properly hand-packed filling interstices with Kharanja stone including spreading watering etc. complete as per HP.PWD specification 150mm spread thickness (finished work including materials and labour) including carriage of materials within all leads and lifts.
Disposal of excavated earth by mechanical means upto 10kms on approved dumping site of M.C. Shimla or on arranged by the contractor i.e. through all mode of transportation including head load animal load or mechanical means alongwith transportation of the unuseful material for disposing including payment of prescribed charges of dumping to the owener of dumping site through all modes of transporation including head load animal load or mechanical means alongwith its levelling, fine dressing and to complete the work by mechanized means and labour (if any required) All useful materials such as stones, aggregate and slates shall be sorted out and stacked along roads side any loss of the public/ private property during the courses of execution shall be the absolute responsibility of the contractor which shall have to be dully compensated by him in all respect as per direction of Engineer-in-Charge.
HARGOVIND RANA
baru ram
Manisha Sharma
Suresh Kumar
DALEEP TOMAR
pawan kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .