Loading…
Loading…
Tender Value
₹4.0 L
EMD Value
₹8,060
Closing Date
26 Aug 2026, 5:30 pm3d left
Executive Engineer-V
the office of the Executive Engineer -V, PWD, Altinho Panaji Goa.
Reconstruction of collapsed compound wall at Govt. High School Tarmatha Surla in Sankhali Constituency.
2026_PWD_31241_1
PWD/D-V/ASW-I/25/26-27/L02
Open Tender
Civil Works - Buildings
Percentage
60 days
Altinho, Panaji -Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹8,060
20 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 4.32 | Cu.m | 1,122 | ₹4,847.04 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 24 | Cu.m | 291 | ₹6,984 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 4.8 | Cu.m | 2,211 | ₹10,612.8 |
| 4 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a) All works upto plinth level | 14.4 | Cu.m | 6,635 | ₹95,544 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 18 | Cu.m | 7,442 | ₹1,33,956 |
| 6 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete. | 20 | sq.m | 407 | ₹8,140 |
| 7 | Centering and shuttering including struttings, propping etc. and removal of formwork for : b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 60 | sq.m | 479 | ₹28,740 |
| 8 | Laterite masonry in neatly dressed stones for 20 cms thick masonry walls in cm. 1 : 4 (1 cement : 4 coarse sand) in foundation upto plinth level | 8.34 | Cu.m | 6,453 | ₹53,818.02 |
| 9 | 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge. | 104.4 | sq.m | 329 | ₹34,347.6 |
| 10 | Painting three or more coats with acryllic exterior paint of approved brand and manufacture (Such as Dulex/ Asian Paints/ Sherwin Willians) including applying one coat of cement primer and one coat of surface treatment etc. complete. | 104.4 | sq.m | 208 | ₹21,715.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_31635.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].