Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance H N 131 GOPLAPUR NEW SHIVPURI GOPLAPUR GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
3 Oct 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC Gorakhpur
Mohaddipur, Gorakhpur
the work of 36 No. Different S/s Strenthening work of under Electricity Distribution Circle-I Gorakhpur and 07 No. Different S/s Strenthening work of under Electricity Distribution Circle-II Gorakhpur Under the head of Business Plan
2025_PVVNV_1071597_1
33/EWC(G)/2025-26
Open Tender
Electrical Works
Item Wise
60 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EWC Gorakhpur
₹25,000
1 Nov 2025
6 Sept 2025
4 Oct 2025
6 Sept 2025
3 Oct 2025
6 Sept 2025
Amount
Work 1 EDC I GKP Particulars (Provided by contractor) Strenthening of 33/11 KV S/s Jagdishpur
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Jagdishpur under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 2 EDC I GKP Particulars (Provided by contractor) Strenthening of 33/11 KV S/s Pipraich
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Pipraich under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 3 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Sarhari
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Sarhari under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 4 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Raiganj
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Raiganj under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV ‘XLPE’ Cable 3x300mm²
Laying of 33 KV “XLPE” cable 3 x 300 mm2 by Manually Method with sand and bricks
Charges for jointing of 33 KV C/J kit outdoor
Making loop and rising of 33 KV cable
Work 5 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Mundera Bazar
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Mundera Bazar under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV ‘XLPE’ Cable 3x300mm²
Laying of 33 KV “XLPE” cable 3 x 300 mm2 by HDD Method
Charges for jointing of 33 KV C/J kit outdoor
Special pipe earting
Making loop and rising of 33 KV cable
NOC for railway crossing provided by contractor (for existing cable replacement)
Work 6 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Khorabar Gramin
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Khorabar Gramin under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV PT
Wiring and complete connection of 33 KV PT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 7 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Rajdhani
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Rajdhani under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV VCB
33 KV Double feeder Control pannel
Installation of following Equipments
33 KV VCB with structure
33 KV double feeder Control pannel
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Dismantling of existing pale fencing and resetting after completion of work.
Wiring and complete connection of 33 KV VCB with earthing.
Wiring and complete connection of 33 KV feeder control pannel with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 8 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Raiganj
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Raiganj under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV PT
Wiring and complete connection of 33 KV PT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 9 PART -A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Motiram Adda under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Installation of following Equipments on erected structure and related connection
33 KV Line Isolator
Work 10 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Khorabar Gramin under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Installation of following Equipments on erected structure and related connection
33 KV Line Isolator
Work 11 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Jungle Kaudia under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Installation of following Equipments on erected structure and related connection
33 KV Line Isolator
Work 12 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Netwar under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Installation of following Equipments on erected structure and related connection
33 KV Line Isolator
Work 13 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Installation of following Equipments on erected structure and related connection
33 KV Line Isolator
Work 14 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Campierganj Gramin
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj Gramin under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV VCB
Installation of following Equipments
33 KV VCB with structure
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Dismantling of existing pale fencing and resetting after completion of work.
Wiring and complete connection of 33 KV VCB with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 15 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Netwar
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Netwar under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV VCB
Installation of following Equipments
33 KV VCB with structure
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Dismantling of existing pale fencing and resetting after completion of work.
Wiring and complete connection of 33 KV VCB with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 16 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Jungle Kaudia
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Jungle Kaudia under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV VCB
Installation of following Equipments
33 KV VCB with structure
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Dismantling of existing pale fencing and resetting after completion of work.
Wiring and complete connection of 33 KV VCB with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 17 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Saunaura
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Saunaura under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV VCB
Installation of following Equipments
33 KV VCB with structure
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Dismantling of existing pale fencing and resetting after completion of work.
Wiring and complete connection of 33 KV VCB with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 18 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Machaligao
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Machligao under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV VCB
Installation of following Equipments
33 KV VCB with structure
Dismentling of Busbar with jumper and all fitting and stringing of ACSR Dog conductor complete work.
Dismantling of existing pale fencing and resetting after completion of work.
Wiring and complete connection of 33 KV VCB with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 19 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Singhorwa
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Singhorwa under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Installation of 33KV PT
Wiring and complete connection of 33 KV CT with earthing.
Wiring and complete connection of 33 KV PT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 20 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Machligao
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Machligao under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Installation of 33KV PT
Wiring and complete connection of 33 KV CT with earthing.
Wiring and complete connection of 33 KV PT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 21 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Singhorwa
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Singhorwa under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 22 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Netwar
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Netwar under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 23 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Jangle Kaudia
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Jangle Kaudia under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 24 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Campierganj
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 25 EDC I GKP PART -A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Saunaura under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 26 EDC I GKP PART -A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Netwar under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 27 EDC I GKP PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Jungle Kaudia under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 28 EDC I GKP PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Saunaura under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 29 EDC I GKP PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj gramin under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 30 EDC I GKP PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj Gramin under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 31 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Singhorwa
33 KV V type X-arm
X-arm clamps with nut and bolt.
F Bracket for 33 KV
33 KV Polymer Pin Insulator
Barbed wire.
Allumunium Paint.
Bolts, Nuts, & Washers.
Red Oxide Paint.
Earthing complete
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Singhorwa under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
ST Pole 11 M long
ACSR Dog conductor
Erection of Single pole on 11 m long for 33 KV O/H line with complete fitting and grouting and all related materials installation.
Jumper of pole and etc work related to conductor.
Work 32 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Machligao
33 KV V type X-arm
X-arm clamps with nut and bolt.
F Bracket for 33 KV
33 KV Polymer Pin Insulator
Barbed wire.
Allumunium Paint.
Bolts, Nuts, & Washers.
Red Oxide Paint.
Earthing complete
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Machligao under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
ST Pole 11 M long
ACSR Dog conductor
Erection of Single pole on 11 m long for 33 KV O/H line with complete fitting and grouting and all related materials installation.
Jumper of pole and etc work related to conductor.
Work 33 EDC I GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Campierganj and Saunaura
33 KV Polymer Pin Insulator
Number Plate with clamp
Danger Board with Clamp
Barbed wire
Bolts, Nuts, & Washers
33 KV. Top channel (125x65mmX3200 mm (10.7 Kg/m)
Top channel clamp with nut bolt for ST Pole with nut bolt by 50x8 mm MS flat Iron make
Stay complete 20x1800mm (Per Stay Set=01No stay Rod+10 Kg Stay wire/Stay + 01No Stay clamp)
Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire)
33 KV Polymer Disc Insulator B& S Type
33 KV Polymer Disc Fitting
P.G. Clamp for Dog
‘E’ Bracket for 33 KV with nut & bolt for ST Pole with nut bolt by 50x8 mm MS flat Iron make
M.S. Angle Iron 65x65x6mm bracing set (1Set=02No Angle with 04 No clamp) with nut and bolt.
Al. paint
Red oxide paint
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj and Saunaura under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
ST Pole 11 M Long
ACSR Dog Conductor
Special Grouting /Concreting of pole as per water logging area.
Erection of Four pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection, fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete).
Dismantling of existing ACSR Dog conductor and ready to use
Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03Nos. conductor in parallel.
Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension.
Pole extension for 13 mtr
Dismantling of existing all fitting
Work 34 EDC I GKP Particulars (Provided by contractor) Installation 02 Nos. Four Pole at 33/11 KV S/s Saunaura
33 KV Polymer Pin Insulator
33 KV Polymer Disc Insulator
33 KV Polymer Disc Insulator fitting
PART - B- WORK (33/11 KV S/s Sonaura)
Installation of 33 KV Polymer pin insulator
Installation of 33 KV Polymer Disc insulator
Installation of 33 KV Polymer Disc fitting
Dismantling of existing conductor and resagging after installation of insulators
Dismantling of existing different type of insulators
Work 35 EDC I GKP PART -A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Saunaura under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 36 EDC I GKP PART -A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Campierganj under EDC-1 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 1 EDC II GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Basgao Tahsil and Gramin
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
PART -A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Basgao Tahsil and Gramin under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV ‘XLPE’ Cable 3x300mm²
Laying of 33 KV “XLPE” cable 3 x 300 mm2 by Manually Method with sand and bricks
Charges for jointing of 33 KV C/J kit outdoor
Making loop and rising of 33 KV cable
Work 02 EDC II GKP PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Gola under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33 KV L.A.
Work 3 EDC II GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Ratanpura
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Ratanpura under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 4 EDC II GKP Particulars (Provided by contractor) Strenthening Work of 33/11 KV S/s Ratanpura
Armoured copper 2x2.5 mm
Armoured copper 4x2.5 mm
PART - B- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Ratanpura under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
Installation of 33KV CT
Wiring and complete connection of 33 KV CT with earthing.
Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete.
Work 5 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Ahirauli under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
33 KV Fuse Set
Installation of following Equipments on erected structure and related connection
33 KV Line Isolator
Fuse Set
Work 6 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station Sahjanwa Tahsil under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Line Isolator Structure
Erection and grouting of LSI Structure
Installation of 33 KV Line Isolator and all related jumper and connection
Work 7 PART - A- WORK Shifting & loading of following materials on private truck from store centre Gorakhpur & carriage up to 33/11 KV Sub-Station gangtahi under EDC-2 Distt- Gorakhpur & Un-loading of the same with proper stacking
33 KV line Isolator 400Amp
Installation of 33 KV Line Isolator and all related jumper and connection
M/s Anil kumar singh (BID ID -5579789)
stage.html
html • 0.03 MB
technical_1955510.pdf
techsummary_1955510.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
33tenderform.rar
Tender Documents • 0.13 MB
BOQ_1955510.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .