Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC NICHUPATTY BOLPUR BIRBHUM | BIRBHUM | WEST BENGAL | 713129 | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹41,000
Closing Date
17 Apr 2017, 3:00 pmClosed
Superintending Engineer,Western El.Circle,PWD
Office of the Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Day to day operation of4 (four) nos Bed-cum passengers lift at Burdwan Medical College and Hospital, Burdwan with effect from 01.05.2017 to 31.03.2018.
2017_WBPWD_108273_1
WBPWD/SEWEC/BED /NIQ-01/2017-18 (4th Call)
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
Burdwan
Please refer Tender documents.
4 documents required · 4 mandatory
₹41,000
Yes
4 Nov 2020
10 Apr 2017
19 Apr 2017
10 Apr 2017
17 Apr 2017
10 Apr 2017
Amount
Day to day operation of 4 (four) nos of Bed-cum passengers lift at Burdwan Medical College and hospital everyday including holidays in 3 shifts round the clock.
SCOPE OF WORK & TERMS & CONDITIONS 1. The Lift Operator / Attendant should have a sound knowledge with valid Lift Operator’s License duly issued by the Licensing Board, Govt, of West Bengal. 2. The Lift Operator / Attendant should be dutiful and polite to all. They should be withdrawn for any complaint of irregularities against them. 3. The report is to be submitted periodically about the condition of the lift & all of its accessories with safety devices to the concerned AE / SAE. 4. The Agency should provide individual Operators for 3(three) shifts for all 4 lifts (6:00 am to 2:00 pm, 2:00 pm to 10:00 pm, 10:00 pm to 6:00 am) and the operators should maintain hand to hand handover of their duty. 5. The operational work of the lift is to be supervised directly under the supervision of the Contractor under the direct control of the SAE. The Contractor will be responsible for any damage to the lift due to mishandling. Any loss due to this will be recovered from the Contractor’s bill as per direction of E.I.C.
6. The Log Book is to be maintained at site by the Contractor for recording functioning of lift and breakdown under the supervision of SAE concerned. If any kind of trouble arises it should be brought to the notice of SAE, AE concerned immediately. 7. In case of any absence of Operator the lift is to made operative immediately and within l(one) hour by placing the new operator. In case of absence proportionate deduction will be made from the Contractor’s Bill. The contract may be terminated if the absence exceeds more than thee days. EE’s decision will be final in this respect. 8. The Department would not be held responsible for any accident of the Liftman on duty for any reason. The Contractor or their Lift Operator would not claim any compensation in any shape from this department for such accident. 9. Any conditional offer in the Quotation and Quotation offered with price variation clause would not be accepted. 10. The payment will be made monthly/quarterly on submission of the bill in triplicate by the Agency with satisfactory report of performance by the concerned AE & SAE.
11. The Lift Operator deputed by the Agency should wear the Photo Identity Card issued by the Agency. A copy of this card is to be submitted to the concerned SAE. 12. The agency should submit a copy of the Duty Roster of the Lift Operator at the beginning of each month (or as directed time to time ) to the concerned SAE. In case of breakdown / malfunctioning of a particular lift the Operator should operate standby lift during their duty hours. 13. The Executive Engineer, Bardhaman Electrical Division, PWD reserve the right to terminate the Contract with one month notice to the Agency for non satisfactory performance or other administrative reasons. 14. The lift enclosure should be kept clean regularly by the operator.
Add Service Tax as Applicable.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .