Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-Finance | L1 | Accepted-Finance Qualified in the Technical Evaluation | |
| 2 | L2₹20.6 L+₹88,920.95 (4.50%)Accepted-Finance | L2 | Accepted-Finance Qualified in the Technical Evaluation |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
21 Apr 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer VP
Panchayat union office Chithamur
Consturction 6 Work in Vilankadu Colony Vilankadu Panchayatchithamur Union
2023_RDTN_302430_1
2310/2021/A9 dt2202.2023
Open Tender
Civil Works
Item Rate
180 days
Chithamur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
Yes
16 Jun 2023
15 Apr 2023
21 Apr 2023
15 Apr 2023
21 Apr 2023
15 Apr 2023
Amount
Part-I: Construction of Rcc Slab Culvert in Vilankadu Colony Thulukanthamman koil Street @ Vilankadu Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 19/ 2022-23. Estimate Amount : Rs.3.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-II: Construction of Rcc Slab Culvert in Vilankadu Colony Burial Ground Salai @ Vilankadu Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 19/ 2022-23. Estimate Amount : Rs.3.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-III: Construction of Rcc Slab Culvert in Vilankadu Colony Burial Ground Salai @ Vilankadu Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 19/ 2022-23. Estimate Amount : Rs.3.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-IV: Construction of Rcc Slab Culvert in Vilankadu Colony Burial Ground Salai @ Vilankadu Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 19/ 2022-23. Estimate Amount : Rs.3.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-V: Construction of Drainage in Vilankadu Colony @ Vilankadu Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 19/ 2022-23. Estimate Amount : Rs.5.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Part-VI: Construction of Rcc Slab Culvert in Vilankadu Colony Nehru Street @ Vilankadu Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 19/ 2022-23. Estimate Amount : Rs.3.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.MURALI
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .