Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance | L1 | Accepted-Finance as per financial evluation L1 | |
| 2 | L2₹7.5 L+₹42,420.07 (6.00%)Accepted-Finance | L2 | Accepted-Finance as per financial evluation L2 | |
| 3 | L3₹8.7 L+₹1.7 L (23.6%)Accepted-Finance | L3 | Accepted-Finance as per financial evluation L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Required Bank Certificate regarding overdraft / credit facilities and the unutilized credit limit has not been furnished. Hence, the bidder is technically rejected for non-compliance with the tender eligibility requirement. |
| Sl No | Description | Qty | Unit | M.Arumugam L2 | SUJITH ASSOCIATES L3 | AJS Contractors L1 |
|---|---|---|---|---|---|---|
| 1.00Strengthening the road from Erumakuttapallam main road to Jion nagar 1st street end H/o Kondappanaickenpatty | ||||||
| 2.00Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | ||||||
| 3.00 | KM 0/0 - 0/200 | 121.2 | m2 | 2.28 ₹276.34 Lowest | 5 ₹606 | 5.1 ₹618.12 |
| 4.00Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | ||||||
| 5.00 | KM 0/0 - 0/200 | 262.92 | m2 | 20.48 ₹5,384.6 | 20 ₹5,258.4 | 18.73 ₹4,924.49 Lowest |
| 6.00collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | ||||||
| 7.00 | KM 0/0 - 0/200 | 36.36 | m3 | 65 ₹2,363.4 Lowest | 100 ₹3,636 | 120.34 ₹4,375.56 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix acadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | ||||||
| 9.00 | KM 0/0 - 0/200 | 118.32 | m3 | 2,210.52 ₹2,61,548.73 | 2,400 ₹2,83,968 | 2,022.13 ₹2,39,258.42 Lowest |
| 10.00Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp | ||||||
Tender Value
₹8.9 L
EMD Value
₹8,950
Closing Date
29 Sept 2026, 3:00 pmClosed
BDO VP, Salem
BDO office, Salem
Strengthening the road from Erumakuttapallam main road to Jion nagar 1st street end H/o Kondappanaickenpatty, Salem Block under Panchayat General Fund 2026-2027 at Salem District.
2026_RDTN_704526_1
263-2026-T2
Open Tender
Civil Works - Roads
Item Wise
90 days
BDO office
as per document
3 documents required · 3 mandatory
₹0
₹8,950
8 Oct 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening the road from Erumakuttapallam main road to Jion nagar 1st street end H/o Kondappanaickenpatty | - | - | - | - |
| 2 | Clearing the Scrub jungle by uprooting including all
cutting charges and disposing of the products and
clearing as directed by the departmental officers
including all incidental charges etc., complete. | - | - | - | - |
| 3 | KM 0/0 - 0/200 | 121.2 | m2 | - | - |
| 4 | Picking 5 cm to 10 cm old metalled surface and
sectioning - 1 sq m | - | - | - | - |
| 5 | KM 0/0 - 0/200 | 262.92 | m2 | - | - |
| 6 | collection and supply of carted earth from approved
quarry an average lead 1km including cost and
conveyance of all materials to site anf labour
charges etc. | - | - | - | - |
| 7 | KM 0/0 - 0/200 | 36.36 | m3 | - | - |
| 8 | Providing and laying spreading and compacting
graded stone aggregate to Wet Mix acadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | - | - | - | - |
| 9 | KM 0/0 - 0/200 | 118.32 | m3 | - | - |
| 10 | Applying PRIMECOAT over WMM surface at
7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m
including labour for spraying, hire charges for
bitumen sprayer etc. Comp | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tenderdocument.pdf
Tender Documents • 1.03 MB
BOQ_846862.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .