Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹10.1 LAccepted-AOC | ₹10.1 L | 1st | Accepted-AOC Win due to 1st lowest |
| 2 | 2nd₹10.6 L+₹59,629 (5.93%)Rejected-AOC | ₹10.6 L+₹59,629 (5.93%) | 2nd | Rejected-AOC reject due to 2nd lowest |
| 3 | 3rd₹13.6 L+₹3.5 L (34.9%)Rejected-AOC | ₹13.6 L+₹3.5 L (34.9%) | 3rd | Rejected-AOC reject due to 3rd lowest |
| 4 | 4th₹14.3 L+₹4.3 L (42.4%)Rejected-AOC | ₹14.3 L+₹4.3 L (42.4%) | 4th | Rejected-AOC reject due to 4th lowest |
Tender Value
₹17.0 L
EMD Value
₹17,100
Closing Date
30 Mar 2026, 4:00 pmClosed
SE R and B Division No I Berhampur
SE R and B Division No I Berhampur
Repair work of Zonal Office Building BSE, Odisha, ambapua, Berhampur.
2026_EICCL_127567_12
SE R and B Divn NoI Bam 69 /2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
Berhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹17,100
Yes
2 Jul 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
24 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. | - | Square Meters | - | - |
| 2Earth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods to maximum 5cm to 7cm & laying in layers not exceeding .0.3m depth and as per direction of the Engineer-in-Charge | |||||
| 3Construction of Granular Sub Base by providing Grading VI material, spreading in 8uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | |||||
| 4Cement concrete of proportion (1:3:6) in F&F using 40mm size bhg metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect | |||||
| 5Cement concrete of proportion (1:2:4) in F&F using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect. | |||||
| 6Providing and laying 80mm thick factory made cement concrete interlocking paver block of M-40 grade of approved make size & design colour & shape made by block making machine with proper compaction laid in required pattern complete in alll respect confirming to IRC SP-63-2018. | |||||
| 7Fixing of Chequred tiles in floors, Trades of steps & Landing with with cement morter(1:1) with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect | |||||
| 8Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. | |||||
| 9Providing 6 mm thick cement plaster with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to R.C.C. work after closed deep chipping & slurry treatment including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. | |||||
| 10Dismentalling A.C.C/ G.C.I sheet roofing after carefully removing the nuts including stacking the materials for re-use and removing the debris with in 50m lead, including cost of all labour with T&P etc. complete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586227.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
12.pdf
Tender Documents • 1.21 MB
BOQ_586227.xls
BOQ • 3.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .