Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹5.3 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | BABLU SINHA L1 |
|---|---|---|---|---|
| 1.00Discription of items | ||||
| 2.00 | Supply at work site sal wood 1 winding Engine drum lagging Size(5"x4"x47") | 1 | ls | 2,35,590 ₹2,35,590 |
| 3.00 | Supply at work site 20 mm x 2 150 mm HT bolt. 10.9 grade half thread | 1 | ls | 47,995 ₹47,995 |
| 4.00 | 3 Supply at work site 20 mm HT Nut 10.9 grade | 1 | ls | 12,355 ₹12,355 |
| 5.00 | Dismantling of winding Engine rope, after fitting the drum lagging fitting the same rope on winder Engine drum. | 1 | ls | 49,394 ₹49,394 |
| 6.00 | Dismantling of old and damaged durm lagging from the drum and transporting the same to colliery store | 1 | ls | 41,197 ₹41,197 |
| 7.00 | Cleaning of complete of circumference wodden lagging | 1 | ls | 32,929 ₹32,929 |
| 8.00 | Sizing of new wooden lagging as per drum periphery, drilling holes on either end and fitting the same on drum | 1 | ls | 82,394 ₹82,394 |
| 9.00 | CMPF cost (limited to the amount paid as per labour payment certificate) | 1 | ls | 23,811 ₹23,811 |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹6.2 L
EMD Value
₹7,800
Closing Date
23 Feb 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
supply and installation of Sal wood drum lagging in electrical winder of No-8 Pit at Bankola Colliery
2026_ECL_353020_1
ECL/GM/BA/E TENDER/25-26/ENM/256 Dt 13.02.2026
Open Tender
Electrical and Maintenance Works
45 days
Bankola Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,800
2 Mar 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
13 Feb 2026 - 16 Feb 2026
Discription of items
Supply at work site sal wood 1 winding Engine drum lagging Size(5"x4"x47")
Supply at work site 20 mm x 2 150 mm HT bolt. 10.9 grade half thread
3 Supply at work site 20 mm HT Nut 10.9 grade
Dismantling of winding Engine rope, after fitting the drum lagging fitting the same rope on winder Engine drum.
Dismantling of old and damaged durm lagging from the drum and transporting the same to colliery store
Cleaning of complete of circumference wodden lagging
Sizing of new wooden lagging as per drum periphery, drilling holes on either end and fitting the same on drum
CMPF cost (limited to the amount paid as per labour payment certificate)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.24 MB
BOQ_365815.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid