| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate. | |
| 2 | L2₹1.8 L+₹1,142 (0.65%)Rejected-Finance 2 102A SREE COLONY KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | L2 | Rejected-Finance Higher Rate. | |
| 3 | L3₹1.8 L+₹1,803 (1.03%)Rejected-Finance | L3 | Rejected-Finance Higher Rate. | |
| 4 | L4₹1.8 L+₹4,570 (2.60%)Rejected-Finance | L4 | Rejected-Finance Higher Rate. | |
| 5 | L4₹1.8 L+₹4,570 (2.60%)Rejected-Finance | L4 | Rejected-Finance Higher Rate. |
Tender Value
₹1.8 L
EMD Value
₹3,571
Closing Date
23 Jun 2026, 2:00 pmClosed
Assistant Engineer, PWD, KMCH Sub-Division.
33A Eden Hospital Road, Kolkata-700073
RIO/ Kolkata Medical College Hospital-Emergent repair of dilapidated portion at 3rd floor C- OT zone, replacement of damaged flush door and painting of RIO building, during the year 2026-2027. (Civil Works)
2026_WBPWD_5015312_4
WBPWD/AE/KMCHSD/NIT-01e/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Kolkata Medical College Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,571
Yes
14 Jul 2026
10 Jun 2026
25 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 72.36 | M2 | 19 | ₹1,374.84 |
| 2 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. | 38.61 | M2 | 90 | ₹3,474.9 |
| 3 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] | 3.86 | M2 | 782 | ₹3,018.52 |
| 4 | Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface). | 38.61 | M2 | 309 | ₹11,930.49 |
| 5 | Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge.
37.5mm thick | 38.61 | M2 | 381.23 | ₹14,719.29 |
| 6 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
With 1:6 cement mortar
20 mm thick plaster
3rd Floor | 33.75 | M2 | 183.73 | ₹6,200.89 |
| 6.01 | With 1:4 cement mortar
10 mm thick plaster
3rd Floor | 38.61 | M2 | 142.55 | ₹5,503.86 |
| 7 | Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] | 72.36 | M2 | 87.59 | ₹6,338.01 |
| 8 | Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick) | 84.36 | M2 | 110 | ₹9,279.6 |
| 9 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). | - | M2 | 83,818 | - |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_5084037.xls
BOQ • 0.33 MB
WBF_2911_Modified_aekmchsd.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .