Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance 88 307 T CHAMAN GANJ KANPUR | KANPUR | KANPUR | UTTAR PRADESH | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹6.6 L+₹36,439.01 (5.88%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹7.2 L+₹98,385.34 (15.9%)Rejected-Finance H NO 413 VILLAGE SULKHANI P O BUGANA 125121 | HISAR | HARYANA | 125121 | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹7.2 L+₹1.0 L (16.5%)Rejected-Finance 12 30 126 A CHAMANLAL KI KUAN | L4 | Rejected-Finance L4 Bidder |
Tender Value
₹7.3 L
EMD Value
₹72,878
Closing Date
19 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Repair work on the damaged road and drain in front of Shastri Bhawan in khalasi line under Ward-10, Zone-4.
2026_NNKAN_1183032_1
270/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-10
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹72,878
23 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work-earth work 2.1 (2.1,1) work in surface excavation not exceeding 30 cm in depth but ceeding 1.5 m In width as well as 10 sqm on plan including getting out d disposal of excavated earth upto SO m and lift upto 1.5 m, as directed Engineer-in- Charge: 2.1.1 All kinds of soil.o 0.30 M | 27 | cum | 170 | ₹4,590 |
| 2 | Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement : 4 coarse sand) | 19.5 | cum | 6,600 | ₹1,28,726.4 |
| 3 | Concrete/R.C.C. Work-4.1.8 Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm (nominal size) | 13.57 | cum | 5,740 | ₹77,880.32 |
| 4 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment) | 424 | rmt | 458 | ₹1,94,192 |
| 5 | granular sub base (GSB) etc all comp. construction of granular sub base (GSB) etc all comp.- | 14.4 | cum | 3,676 | ₹52,934.4 |
| 6 | Concrete/R.C.C. Work-Concrete /R.C.C Work 1:1½:3 (1 Cement: 1½ coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size) | 18 | cum | 7,160 | ₹1,28,880 |
| 7 | Providing and applying white cement based putty of average thickness of 1mm of approved brand and manufacture over the plaster wall surface to prepare the surface Providing and applying white cement based putty of average thickness of 1mm of approved brand and manufacture over the plaster wall surface to prepare the surface even and smooth including cost of material labour | 106 | sqm | 132 | ₹13,992 |
| 8 | Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. | 106 | sqm | 135 | ₹14,310 |
| 9 | Cortage of Earth or Malvaup to 3 KM including all completion of work Cortage of Earth or Malvaup to 3 KM including all completion of work | 18 | cum | 116.96 | ₹2,105.28 |
| 10 | Add 18 % G.S.T. | 1 | Tax | 1,11,169.87 | ₹1,11,169.87 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_2224760.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_2224760.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .