Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.0 LAccepted-AOC | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹7.0 L+₹118 (0.02%)Rejected-AOC | 2 | Rejected-AOC 2nd lowest | |
| 3 | 3₹7.5 L+₹49,250 (7.07%)Rejected-AOC | 3 | Rejected-AOC 3rd lowest | |
| 4 | 4₹7.5 L+₹56,837 (8.16%)Rejected-AOC VILL ODDI P O KIAR TEHSIL THEOG DISTT SHIMLA H P | 4 | Rejected-AOC 4th lowest | |
| 5 | 5₹7.7 L+₹76,075 (10.9%)Rejected-AOC | 5 | Rejected-AOC 5th lowest |
Tender Value
Refer Docs
EMD Value
₹20,585
Closing Date
21 Sept 2021, 5:00 pmClosed
EE JS Div Matiana
EE JS Div Matiana
SH C O Nallah Intake ,Storage Tank of 10000 Ltrs Cap and Laying and Jointing of Distribution System
2021_HPIPH_52237_1
JS-DM-CB-21/4453-93/4
Open Tender
Civil Works
Item Rate
365 days
CHeog
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
Yes
EE Matiana
₹20,585
Yes
17 Mar 2022
13 Sept 2021
22 Sept 2021
13 Sept 2021
21 Sept 2021
13 Sept 2021
Amount
Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts.
Excavation in foundation,trenches etc.in earth work,lift upto 1.50 meters staking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stackedsoil in 15 cm.layers,when required in to plinths sides of foundation etc.consolidating each deposited layer by ramming and watering and then dispossing of all surplus excavated earth asdirected with in a lead of 20 meters:- In P&J work 50 % each.
Excavation in drains and channels etc. in earth earth work for pipes upto all depth in all clasification of earh work such as pick work, jumper work saturated soil i/c balling or pumping out water , blasting soft/ hard rock or chissling soft / hard rock where blasting is prohibited in all lifts i/c jungle clearance whereever required trimming and dressing of sides leveling of beds to correct grade i/c shorring / struting , planking , timbring and dewatering wherever required stacking the useable / unuseable material / soil separately and after laying and jointing and testing of pipes , returing the useable soil in trenches in 15 cm layer i/c consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil / un usable material as directed with in all leads and lifts i/c restoration of un metalled surfaces to its original condation and i/c cost of diversion for traffic night signals , fixing caution boards, crossing over trenches for acess for houses , fencing ect. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge.
Providing and laying cement concrete 1:4:8 (1:cement:4 sand:8 graded stone aggregate 40mm nominal size)and curing complete excluding cost of form work in :-Foundation and plinth
Providing form work with steel plates 3.15mm thick so as to give fair finish I/c centering shuttering propping etc. height of propping below supporting floor to ceiling not exceeding 4mt. Height & removal of same in situ reinforce ment concrete and plain concrete work in :-
Foundation & plinth
Flat surfaces such as soffits of suspended floor roofs landing & like floor etc.,upto 200mm thickness.
Vertical surface such as walls(any thickness)partation and the like including attached pillasters buttresses,plinth and string courses and the like.
Edge of slab and break in floor 20 cm wide
Beams, cantilever Girders& lintals sides&soffits of beams, beams,haunching cantilever girders not exceeding 1mtr. Depth.
Providing and laying cement concrete work 1:11/2:3 (1:cement:11/2 sand:3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work in and reinforcement for reinforced concrete work in :-a:-Foundation and plinth.
Wall anny thickness but not less than 0.1 meter in thickness.including attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto flooor two level
Lintel, beams girders and Contilevers etc.up to floor to level.
Providing mild steel / tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor two level. Tor steel
Providing & laying CC 1:2:4 1cement:2 sand 4 graded aggregates 20mm nominal size curing complete excluding cost of form work & reinforcement for RCC work in:-
In suspended floor roofs landing shalves & their support balconies,beams, girders bressumers cantilevers upto floor two level
Prov.and laying GMS Tubes (Light grade)tube fittings complete(earth work to be measured and paid for separatly
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
Providing & Fixing Wheel Valve of superior quality i/e all leads & lift.
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
Supplying cast iron cover without frame for manholes for frame of 500 mm internal dia meters.C.I.cover (Medium duty ) the weight of cover to be not less than 58 kg.
Providing and placing in horizental layers filtering media duly graded,screened,washed and cleaned as specified by the Engineer - in - Charge :-
Top layer :- Coarse sand 6mm - 12mm.
Middle Layer Bajri :- 20mm - 25mm.
bottom Layer Bajri 25mm - 50mm,
Providing and laying of No fine concrete in cement mortar 1:6(1cement:6graded stone agg.20mm nominal size )in walls. Complete in all respect as per the direction of the Engineer-in-charge.
P/F Brass Tap (450 grm) 15mm dia Suprior Quality completed all respect including all leads & lift
Krishna Nand Sharma
Surinder Singh Verma
Sandeep Verma
Deep Ram Chauhan
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .