Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L Quoted ₹15.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹19.6 LRejected-AOC C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹19.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | veeramuthu enterprises L1 | ANBU ENGINEERING INDIA PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | MS Plate 3.15 mm thick IS 2062, Grade B, Including Loading, transportation &Unloading. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges. The material will be supplied by TNPGCL if available at stores during execution of works) | 1.3 | MT | 84,615 ₹1.1 L | 1,04,720 ₹1.4 L |
| 2.00 | Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from APH outlet to before chimney area. Including cost of consumables and T&P's. | 230 | M² | 223.21 ₹51,338.30 | 275 ₹63,250 |
| 3.00 | Transporting of 6mm / 8 mm Corton steel Plate from central stores to boiler area cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout plates (multilayer)above 1.5 meter level and welding the same from APH outlet to before chimney area. Including cost of consumables and T&P's. (The Required Materials will be supplied by TNPGCL) | 210 | M² | 3,492 ₹7.3 L | 4,320 ₹9.1 L |
| 4.00 | Welding eroded initial welding joints in the flue gas duct at APH outlet to before chimneyarea. Including cost of consumables and T&P's. | 300 | Mtrs | 296 ₹88,800 | 365 ₹1.1 L |
| 5.00 | Removing the existing eroded duct supports, supports for FG duct area and transporting of new pipes/Angles from Central Stores / NCTPS, cutting into required size leading, lifting, positioning and welding. Including cost of consumables and T&P's. (The Required Materials will be supplied by TNPGCL) | 20 | M | 361 ₹7,220 | 445 ₹8,900 |
| 6.00 | Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. (3102 x 4054 x 272mm, style #02, FS for FG duct L & R -1no and 1964 x 6161 x 186mm, style #01, FS for FG duct L & R Slope -1no.
Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate, cleaning welding. 0(The Required Materials will be supplied by Contractor) | 175 | Mtr | 1,928 ₹3.4 L | 2,385 ₹4.2 L |
| 7.00 | Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.(The Required Materials will be supplied by TNPGCL) | 45 | Mtr | 5,786.29 ₹2.6 L | 7,160 ₹3.2 L |
Tender Value
Refer Docs
EMD Value
₹15,100
Closing Date
24 Nov 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Flue Gas Duct A Pass Rectification of flue gas duct portions from APH outlet to chimney during annual overhaul for the year 2025 26
2025_EB_625360_1
CE SE MI NCTPS I 251 25 26
Open Tender
Power/Energy Projects/Products
21 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,100
Yes
27 Apr 2026
21 Nov 2025
25 Nov 2025
21 Nov 2025
24 Nov 2025
21 Nov 2025
Amount
MS Plate 3.15 mm thick IS 2062, Grade B, Including Loading, transportation &Unloading. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges. The material will be supplied by TNPGCL if available at stores during execution of works)
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from APH outlet to before chimney area. Including cost of consumables and T&P's.
Transporting of 6mm / 8 mm Corton steel Plate from central stores to boiler area cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout plates (multilayer)above 1.5 meter level and welding the same from APH outlet to before chimney area. Including cost of consumables and T&P's. (The Required Materials will be supplied by TNPGCL)
Welding eroded initial welding joints in the flue gas duct at APH outlet to before chimneyarea. Including cost of consumables and T&P's.
Removing the existing eroded duct supports, supports for FG duct area and transporting of new pipes/Angles from Central Stores / NCTPS, cutting into required size leading, lifting, positioning and welding. Including cost of consumables and T&P's. (The Required Materials will be supplied by TNPGCL)
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. (3102 x 4054 x 272mm, style #02, FS for FG duct L & R -1no and 1964 x 6161 x 186mm, style #01, FS for FG duct L & R Slope -1no. Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate, cleaning welding. 0(The Required Materials will be supplied by Contractor)
Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.(The Required Materials will be supplied by TNPGCL)
ANBU ENGINEERING INDIA PRIVATE LIMITED (BID ID -1519329)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_747804.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid