Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 CrAccepted-AOC | ₹2.1 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.2 Cr+₹2.0 L (0.94%)Rejected-Finance GRAM DHATURIYA DISTRICT RAJGARH MP | ₹2.2 Cr+₹2.0 L (0.94%) | 2 | Rejected-Finance RATE HIGH |
| 3 | 3₹2.2 Cr+₹3.5 L (1.64%)Rejected-Finance | ₹2.2 Cr+₹3.5 L (1.64%) | 3 | Rejected-Finance RATE HIGH |
| 4 | 4₹2.2 Cr+₹4.9 L (2.30%)Rejected-Finance MAHENDRA NAGAR NAWADA BAGH ATNER ROAD BHIND M P | BHIND | BHIND | MADHYA PRADESH | ₹2.2 Cr+₹4.9 L (2.30%) | 4 | Rejected-Finance RATE HIGH |
| 5 | 5₹2.3 Cr+₹17.2 L (8.03%)Rejected-Finance | ₹2.3 Cr+₹17.2 L (8.03%) | 5 | Rejected-Finance RATE HIGH |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
22 Feb 2023, 5:30 pmClosed
PHED BHIND
EE PHED BHIND
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 BADHPURA 2 BADHPURI 3 TOR KA PURA 4 ANURUDHPURA 5 DEPURA Block ATER Distt. BHIND based on Tube.Well including install
2023_PHED_249169_1
NIT No 77/ Procell/EE/ PHED/2023/BHIND
Open Tender
Civil Works - Water Works
Percentage
270 days
ATER
AS PER NIT
8 documents required · 8 mandatory
₹15,000
₹2.3 L
12 Jul 2023
6 Feb 2023
24 Feb 2023
6 Feb 2023
22 Feb 2023
6 Feb 2023
eProcurement System Government of Madhya Pradesh Created By: Ramkumar Singh Rajpoot Created Date/Time: 21-Mar-2023 09:53 AM Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_249169_1
Tender Inviting Authority: EE PHED BHIND
Name of Work: Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village – 1 BADHPURA 2 BADHPURI 3 TOR KA PURA 4 ANURUDHPURA 5 DEPURA Block – ATER Distt. BHIND based on Tube.Well including installation of electric submersible motor pump, construction of R.C.C Sump well cum pump house, construction of R.C.C. Over Head Tenk, laying & jointing of rising main and distribution pipe line system, household tap connections, and electric power connections including cost of material & labour with 90 Days Trial Run After Completion of work And Commissioning of scheme.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 KRISHNA CONSTRUCTION(GSTN-23APKPT7992R1ZL) 23470000.00 -7.75 21651075.00 Two Crore Sixteen Lakh Fifty One Thousand Seventy Five
2.00 M/S SOURABH SINGh BHADORIA(GSTN-23ESBPS2753D1ZX) 23470000.00 -6.51 21942103.00 Two Crore Ninteen Lakh Fourty Two Thousand One Hundred and Three
3.00 BOHARE CONSTRACTION(GSTN-23AWAPD9780A1ZY) 23470000.00 -7.11 21801283.00 Two Crore Eighteen Lakh One Thousand Two Hundred and Eighty Three
4.00 SHREE SKA INFRATECH(GSTN-23BRGPB3072B1ZK) 23470000.00 -1.27 23171931.00 Two Crore Thirty One Lakh Seventy One Thousand Nine Hundred and Thirty One
5.00 M/s SAWARIYA GROUP OF CONSTRUCTIONS(GSTN-NA) 23470000.00 -8.61 21449233.00 Two Crore Fourteen Lakh Fourty Nine Thousand Two Hundred and Thirty Three
Lowest Amount Quoted BY: M/s SAWARIYA GROUP OF CONSTRUCTIONS(21449233.00)
BOQ Summary Details Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_249169_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/s SAWARIYA GROUP OF CONSTRUCTIONS 21449233.00 L1
2 KRISHNA CONSTRUCTION 21651075.00 L2
3 BOHARE CONSTRACTION 21801283.00 L3
4 M/S SOURABH SINGh BHADORIA 21942103.00 L4
5 SHREE SKA INFRATECH 23171931.00 L5
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .