Public Works Department
IMPROVEMENTS TO ROAD FROM JATH JAMBOTI SH-31 BENACHINAMARADI TO JOIN BASAVANAGAR IN GOKAK TALUKA OF BELAGAVI DISTRICT (VILLAGE ROAD) UNDER 5054-04-337-0-01-154 MDR ROAD IMPROVEMENTS FOR 2025-26
302555
PWD/2026-27/RD/WORK_INDENT35960
Open
Roads
PWD Division Office Chikkodi
10 documents required · 10 mandatory
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22,2022-23,2023-24,2024-25 & 2025-26 (c) executed in any one year, the following minimum quantities of work 1)Excavation/subgrade/Embakment-7699.00 CUM,2)GSB-1379.00CUM,3)Metalling(WMM/WBM)-2011.00 CUM,4) Aasphalting(BM/SDBC/DBM/BC)-603.00 Cum
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Improvements of Road of value not less than Rs. 141.18 Lakhs
Tenderers who meet the above specified minimum qualifying criteria will only be qualified,if their available tender capacity is more than the total tender value.The available tender capacity will be calculated as under Assessed available tender capacity is AXNX1.5-B where where A is Maximum value of civil engineering works executed in any one year during the last five years updated to 2026-27 price level taking into account the completed as well as works in progress.N is Number of years prescribed for completion of the works for which tenders are invited is 0.5 Year B is Value at 2026-27 price level, of existing commitments and on-going works to be completed during the next 0.5 year Period of completion of the works for which tenders are invited.
Maximum of Civil Engineering works executed in any one year during the last five years (updated to 2026-27 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2026-27)
Value at 2026-27 price level, of existing commitments and on-going works to be executed during the next 12 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2026-27), (Monthwise commitment shall be furnished)
Availability by owning And Hiring the required or specified key and critical equipment for this work. (As Govt circular PWD.60.CRM.2021 Dated.08/11/2021)1)Availability by lease/hire Excavator like JCB/Hitachi-1No,2)Availability by owning Tippers-2 Nos Owning & 2 Nos Hiring,3)Availability by owning Road Roller/PRR Roller(Vibrator)-1 No,4)Availability by owning Hot Mix Plant (minimum capacity40-60 TPH)-1 No,5)Availability by owning Paver Finisher-1 No,6)Availability by owning Vehicle Mounted (tank) Mechanical Sprayer-1 No&7) Availability by owning/hire Pug Mill (Suitable Capacity)- 1 No
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2021-22,2022-23,2023-24,2024-25 & 2025-26 (a) acheived in at least two financial years a minimum financial turnover of Rs.564.70 lakhs (in all classes of civil engineering construction works only)( Calculated as per Govt circular PWD.60.CRM.2021 Dated.08/11/2021)
Liquid Assets and or availability of credit facilities of no less than Rs.141.18 Lakhs (Credit Lines or letter of credit or certificates from the banks for meeting the fund requirement etc
Report on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.
The EMD of Rs.4,24,000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs.1,00,000.00 br e payment Part (2) Rs.3,24,000.00 EMD shall be in the form Bank Guarantee in the prescribed format obtained from any Nationalised / Scheduled Bank in favour of Executive Engineer, PWD Division, Chikodi payable at Chikodi
Constitutional or Legal Status of the Tenderer
Information on litigation in which the Tenderer is involved:
Name, Address, telephone No., Fax No., and email ID of the Tenderers Bankers
Principal Place of Business
Information on works which are yet to be completed
Information of the works for which Tender acceptance letters are received.
Information of the works for which Tenderer has submitted Tender
Assessed Tender Capacity shall be more than the Tendered Amount
₹5,000
₹4.2 L
3 Jun 2026
3 Jun 2026
20 Jun 2026
16 Jun 2026
15 Jun 2026
PÉ®¸ÀzÀ ºÉ¸ÀgÀÄ : ¨É¼ÀUÁ« f¯Éè aPÉÆÌÃr vÁ®ÆQ£À §¼ÉÆÃ¨Á PÁæ¸ï¢AzÀ ªÀÄÄzsÉÆÃ¼À ¤¥Áàt gÀ¸ÉÛ ªÀgÉUÉ ªÁíAiÀiÁ gÁªÀÄ¥ÀÆgÀ gÀ¸ÉÛ ¸ÀÄzsÁgÀuÉ ªÀiÁqÀĪÀÅzÀÄ. (UÁæ«ÄÃt gÀ¸ÉÛ)
Sl no Items Qty Rate Amount
Construction of Road
2 Earthwork excavation by mechanical means in hard /ordinary soil involving an average horizontal throw upto 2mtrs. & average lift upto 0.5mtrs. excavated surface levelled and sides neatly dressed etc. the desposed earth to be levelled neatly after the breaking of clods completed as per specifications MORTH clause 301. (P No-139 / 19.2.1) Cum 31.5 4115.5 31.5 0.5
5 Scarifying sqm 3.52 1925 1964.55 0.5
7 KSRRB M500-6.KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WBM, WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502 (P No-158 / 21.6 sqm 30.4 8275 30.4 0.5
8 KSRRB M500-10. Tack Coat:- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechancial broom. complete as per specifications. MORTH Specification No. 503 (P No-159 / 21.10.2) using Bitumen 80/100 sqm 10.67 8275 10.67 0.5
9 KSRRB M500-18. Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at 4.5 to 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 500.8 complete in all respects complete as per specifications. (P No-160 / 21.20.6) 25-30mm compacted thickness with 5% bitumen using 60/70 using 40-60 HMP using mechanical paver (Grading-II) cum 7867.49 206.875 7867.49 0.5
10 KSRRB M300-55. Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 complete as per specifications (including cost of earth, watering charges & compaction by vibratory roller)MORTH Specification No. 305 (P No-145 / 19.62) cum 445.2 430.625 445.2 0.5
1 Embnkment cum 69.3 430 445.2 0.5
Construction of Road
2 Earthwork excavation by mechanical means in hard /ordinary soil involving an average horizontal throw upto 2mtrs. & average lift upto 0.5mtrs. excavated surface levelled and sides neatly dressed etc. the desposed earth to be levelled neatly after the breaking of clods completed as per specifications MORTH clause 301. (P No-139 / 19.2.1) Cum 31.5 4115.5 31.5 0.5
5 Scarifying sqm 3.52 1925 1964.55 0.5
7 KSRRB M500-6.KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WBM, WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502 (P No-158 / 21.6 sqm 30.4 8275 2571.45 0.5
8 KSRRB M500-10. Tack Coat:- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechancial broom. complete as per specifications. MORTH Specification No. 503 (P No-159 / 21.10.2) using Bitumen 80/100 sqm 10.67 8275 30.4 0.3
9 KSRRB M500-18. Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at 4.5 to 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 500.8 complete in all respects complete as per specifications. (P No-160 / 21.20.6) 25-30mm compacted thickness with 5% bitumen using 60/70 using 40-60 HMP using mechanical paver (Grading-II) cum 7867.49 206.875 7867.49 0.3
10 KSRRB M300-55. Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 complete as per specifications (including cost of earth, watering charges & compaction by vibratory roller)MORTH Specification No. 305 (P No-145 / 19.62) cum 445.2 430.625 445.2 0.3
1 Embnkment cum 69.3 430 446.2 0.5
Construction of Road
8 KSRRB M500-10. Tack Coat:- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechancial broom. complete as per specifications. MORTH Specification No. 503 (P No-159 / 21.10.2) using Bitumen 80/100 sqm 10.67 8275 10.67 0.2
9 KSRRB M500-18. Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder at 4.5 to 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 500.8 complete in all respects complete as per specifications. (P No-160 / 21.20.6) 25-30mm compacted thickness with 5% bitumen using 60/70 using 40-60 HMP using mechanical paver (Grading-II) cum 7867.49 206.875 7867.49 0.2
10 KSRRB M300-55. Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 complete as per specifications (including cost of earth, watering charges & compaction by vibratory roller)MORTH Specification No. 305 (P No-145 / 19.62) cum 445.2 430.625 445.2 0.2
11 KSRRB M800-13. Road marking with Hot Applie Thermoplastic Compound with Reflecting Glass Beads on Bitumimous Surface :- Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads at 250gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per specifications. (P No-179 / 24.15) MORTH specification No. 803 sqm 375 537.6 537.6 1
15 KSRRB M800-2. Retro-Reflectorised Traffic Signs :- Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 800.1.3, fixed over Aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing complete as per specifications. MORTH Specification No.801 (P No-177 / 24.2.4.1) 80cm x 60cm rectangular - Type-IV sqm 2 3867.15 3867.15 1
16 KSRRB M800 Road markers / Road stud KSRRB M800-35. Providing and fixing of road stud 100x 100 mm, diecast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS: 873 part 4:1973 complete as per specifications (P No-184 / 24.41) no 80 352.8 352.8 1
NAME OF WORK: IMPROVEMENTS TO ROAD FROM JATH JAMBOTI SH-31 BENACHINAMARADI TO JOIN BASAVANAGAR IN GOKAK TALUKA OF BELAGAVI DISTRICT (VILLAGE ROAD) UNDER 5054-04-337-0-01-154 MDR ROAD IMPROVEMENTS FOR 2025-26(PWD/2026-27/RD/WORK_INDENT35960)
Sl no Items Unit Qty Rate Amount Milestone -1 Quantity Milestone -2 Quantity Milestone -3 Quantity Total Quantity Rate in Rs. Amount for Mile Stone 1 in Rs Amount for Mile Stone 2 in Rs Amount for Mile Stone 3 in Rs Total Amount in Rs
Construction of Road
1 Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) a. In area of thorny jungle. (Vol.-3, P.No.9, I.No. 2.5 ii(a)) 100 m2 31.2 412.65 0
2 Compacting Original Ground Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.(Vol.-3, P.No.17, I.No. 3.7) m3 1462.5 110.25 0
3 Surface Drains in Soil Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades,levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307 (Vol.-3, P.No.144, I.No. 16.8) m 1819.9999999999998 26.25 0
4 Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Vol.-1, P.No.7, I.No. 1.8) m3 4786.307 497.7
5 Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Vol.-3, P.No.17, I.No. 3.6) m3 4547.9 517.65
6 By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (Vol.-3, P.No.23, I.No. 4.2(v)) m3 1723.25 2476.95
7 Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Vol.-3, P.No.24, I.No. 4.17) m3 2514.0625 2686.95
8 Prime Coat over WMM/WBM (i) Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means.(Vol.-3, P.No.31, I.No. 5.1A(i)) m2 10056.25 66.15
9 Tack coat on Granular surface treated with primer Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. (P No-43 / 5.33, Vol 3) m2 10056.25 23.1
10 Bituminous Macadam Grading - II for traffic <20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction(Vol.-3, P.No.33, I.No. 5.6(i)C) m3 502.81 10391.85
11 Semi Dense Bituminous Concrete 5.31 IRC-37: 2018 Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision.(Vol.-3, P.No.43, I.No. 5.31) m3 251.4 14281.05 0 0
12 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(P No-67 / 8.15,Vol 3) m2 520 556.5 0 0
13 Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (P No-74/ 8.43,Vol 3) No 315 383.25 0 0
14 Direction and Place Identification Signs with size more than 0.9 m2 size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area exceeding 0.9 m2 fixed over back support frame of min 40 x 40 x 5mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. (Vol.-3, P.No.65, I.No.8.8) m2 2.16 10168.2 0 0
15 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 60 cm equilateral triangle.(Vol.-3, P.No.64, I.No.8.5 A(iv)) Each 3 3740.1 0 0
16 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 60 cm x 45 cm rectangular (P No-64/8.5 A(xii) Vol-3) Each 10 4420.5 0 0
17 Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary Kilometer Stone (Precast) (Vol.-3, P.No.67 I.No.8.16 (ii)) Each 3 3033.45 0 0
18 Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawing Single row for one utility service (Vol.-3, P.No.71 I.No.8.29 (i)) Each 60 2322.6 0 0
1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 m (Vol.-1, P.No.8 I.No.1.14.1 (i)) m3 19.66 107.1 0
2 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates.(Vol.-1, P.No.15 I.No.2.1.3) m3 11.129999999999997 6213.9 0
3 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Vol.-1, P.No.16 I.No.2.4.2) m3 115.97 6532.05 0
4 Culverts (Head walls) 8% (Addendum I - Sr.no.8/pg.no.111) m3 115.97 522.56 0
5 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other types of structures (I.N:2.11,h/ PN-18,Vol-1) Tonne 2.04 84019.95 0
6 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3or culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary works in Head walls and parapets Clause 1101.6 b. 1000mm dia. (Vol.-1, P.No.146 I.No.16.15 b,Vol-3) m 37.5 8354.85 0
7 Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Vol.-1, P.No.7, I.No. 1.8) m3 270.17 497.7 0
8 Painting Two Coats on New Concrete Surfaces: Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Vol 3, I.No.8.10, P.No.66) m2 172.5 114.45 0
3rd 4th 5th Year Maintenance
1 Road Maintenance for 3rd year for road with BM+SDBC as wearing coat Maintenance of Road for 3rd year by Cleaning and Uprooting Vegetation on either sides of the road Maintenance of surface drains by clearing, cleaning reshaping, deepening of side drains, Stripping excess soil from the shoulder surface and Making up loss of material imegulantes on shoulder wherever necessary Maintenance & painting of 200 metre and km stones White washing of parapet walls of CD work and tree trunieks. Patching of shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and Repairs to CDs including Vent Clearance Per km 2.6 28630 0 0
2 Road Maintenance for 4th year for road with BM-SDBC as wearing coat Maintenance of Road for 4th year by Clearing and Uprooting Vegetation on either sides of the road. Maintenance of surface drains by clearing cleaning reshaping, deepening of side drains. Stripping excess soil from the shoulder surface and Making up loss of materiall inegulantes on shoulder wherever necessary Maintenance & painting of 200 metre and km stones White washing of parapet walls of CD work and tree trunks Patching of shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and Repairs to CDs including Vent Clearance Per km 2.6 47010 0 0
3 Road Maintenance for 5th year with BM+SDBC coat as wearing coat Maintenance of Road for 5th year by Clearing and Uprooting Vegetation on either sides of the road.Maintenance of surface drains by clearing, cleaning reshaping, deepening of side drains. Stripping excess soil from the shoulder surface and Making up loss of material/iregulanties on shoulder wherever necessary Maintenance & painting of 200 metre and am stories White washing of parapet walls of CD work and tree trunks, Patching of shallow and deep potholes using premived bitumen mixes corresponding to the layers of the road and Repairs to CDs including Vent Clearance. Per km 2.6 69070 0 0
Total Amount Grand Total Rs
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Motor Grader- In area of light jungle ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 7/2.6iiiA vol-3 Hectare 0.36 146982.15 53310.43 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B0%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
3 Compacting Original Ground- Loosening, leveling Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 15/3.7 vol-3 Cum 784.69 91.35 71681.2 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B1%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
4 Earth work Mechanical Means Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 8/1.12 vol-1 Cum 24.15 68.25 1648.24 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B2%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
6 Surface Drains in Soil Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. Mechanical Means ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 132/20.8-b vo-3 Rmtr 2092.5 19.01 39778.42 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B3%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
9 Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 24/4.27 A vol-3 Cum 1918.12 2513.7 4821590.81 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B4%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
13 Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 145/21-A vol-3 Cum 191.81 11107.95 2130643.66 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B5%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
15 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 57/8.15 vol-3 Sqm 279 501.9 140030.1 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B6%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
17 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 54/8.5 iV vol-3 No 10 3738 37380 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B7%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
18 Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 55/8.7 vol-3 Sqm 7.2 8471.4 60994.08 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B8%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
19 Road Studs Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 150/21-Cvol-3 No 154 383.25 59020.5 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B9%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
20 Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 29/5.1 1Ai vol-3 Sqm 7672.5 46.2 354469.5 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B10%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
21 Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 145/21Aiii vol-3 Sqm 7672.5 13.65 104729.62 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B11%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
22 KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement Table 300-2 complete as per specifications, including cost of gravel / murrum, watering charges & compaction by vibratory roller to 95% of proctors density. MORTH Specification No. 305 ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 1.8/7/vol-3 Cum 5053.2 422.1 2132955.72 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B12%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
23 Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 3.6/15/vol-3 Cum 5161.5 433.65 2238284.48 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B13%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
24 Granular Sub-Base-By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401-For Grading -V Material ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 4.2-v/19/vol-3 Cum 1953 2345.7 4581152.1 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B14%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
25 Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 8.16-ii/57/vol-3 Each 2 2566.2 5132.4 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B15%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
26 Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 5.8-C/31/vol-3 Cum 383.62 8302.35 3184989.02 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B16%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
2 KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing including cost of materials, labour, HOM complete as per specifications. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 15/2.1.3 vol-1 Cum 6.63 6039.6 40042.55 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B0%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
3 Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 17/2.4.2 vol-1 Cum 85.11 7094.3 603767.5 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B1%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
4 Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 71/9.3 vol-3 M.T. 0.85 99009.75 84267.2 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B2%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
5 Providing and laying reinforced cement concrete pipe NP3 for culverts including pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing, including cost of materials, labour, HOM complete as per specifications.Specifications. No. KSRB 1000, 2300 MOST Specification No.1000 I 2300 ....750mm. dia Page No. 254, I.No.34.6.4 ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 135/20.1 63C Rmtr 20 3353.7 67074 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B3%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
6 Providing and laying reinforced cement concrete pipe NP3 for culverts including pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing, including cost of materials, labour, HOM complete as per specifications.Specifications. No. KSRB 1000, 2300 MOST Specification No.1000 I 2300 ....1000mm. dia Page No. 254, I.No.34.6.4 ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 135/20.1 63C Rmtr 40 6459.6 258384 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B4%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
7 Providing and laying reinforced cement concrete pipe NP3 for culverts including pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing, including cost of materials, labour, HOM complete as per specifications.Specifications. No. KSRB 1000, 2300 MOST Specification No.1000 I 2300 ....1000mm. dia Page No. 254, I.No.34.6.4 ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 135/20.1 63C Rmtr 10 6459.6 64596 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B5%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
8 Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 7/1.8/vol-1 Rmtr 84.46 422.1 35650.9 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B6%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
9 Earth work in surface excavation by mechanical means for lowering and levelling the ground for all works other then foundation in all kinds of soils and upto depth not exuceeding 300mm, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleteriours matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. 8/1.14/vol-1 Cum 127.25 76.65 9753.71 (https://eproc.karnataka.gov.in/eprocurement/jsf/indent/view_work_indent_work_detailestimate.seam?actionMethod=jsf%2Findent%2Fview_work_indent_work_detailestimate.xhtml%3AviewWorkIndent.viewLbd%28+detailEstimate+%29&conversationId=6263&conversationIsLongRunning=true&conversationPropagation=join&dataModelSelection=detailEstimate%3AworkIndentWorkSummaryNonSOREstimatesList%5B7%5D塹ᴻ䡿ⲯ嶂藄挧ꮥ)
Grand Total of Detail Estimates 1163535.86
Item Code : As per Electrical SR 3689 15 No --- 55335
Item Name : P.S.C pole 9 mtr long 200 Kg WL -Material Cost
2 Item Code : As per Electrical SR 1166 15 No --- 17490
Item Name : P.S.C pole 9 mtr long 200 Kg WL -Labour Cost
3 Item Code : As per Electrical SR 3054 3 No --- 9162
Item Name : P.S.C pole 8.00 mtr long 145 Kg WL for stud -Material Cost
4 Item Code : As per Electrical SR 932 3 No --- 2796
Item Name : P.S.C pole 8.00 mtr long 145 Kg WL for stud -Labour Cost
5 Item Code : As per Electrical SR 162 4 No --- 648
Item Name : L.T.2 Pin cross arms, with pole clams, bolts, nuts and washers (for PCC poles) -Material Cost
6 Item Code : As per Electrical SR 106 4 No --- 424
Item Name : L.T.2 Pin cross arms, with pole clams, bolts, nuts and washers (for PCC poles) -Labour Cost
7 Item Code : As per Electrical SR 438 10 No --- 4380
Item Name : Horizontal cross arms with pole clams, HTST support, bolts, nuts and washers (for PSC poles) -Material Cost
8 Item Code : As per Electrical SR 106 10 No --- 1060
Item Name : Horizontal cross arms with pole clams, HTST support, bolts, nuts and washers (for PSC poles) -Labour Cost
9 Item Code : As per Electrical SR 17450 2 No --- 34900
Item Name : D.P Structure with 9 mtr RCC poles -Material Cost
10 Item Code : As per Electrical SR 3578 2 No --- 7156
Item Name : D.P Structure with 9 mtr RCC poles -Labour Cost
11 Item Code : As per Electrical SR 180 40 No --- 7200
Item Name : 11 KV pin insulators with GI pins -Material Cost
12 Item Code : As per Electrical SR 164 18 No --- 2952
Item Name : 45 KV Pin Insulators with GI Pins -Material Cost
13 Item Code : As per Electrical SR 4000 2 No --- 8000
Item Name : Guarding bitween HT and LT Lines Guarding materials -Material Cost
14 Item Code : As per Electrical SR 1165 2 No --- 2330
Item Name : Guarding bitween HT and LT Lines Guarding materials -Labour Cost
15 Item Code : As per Electrical SR 830 1 No --- 830
Item Name : Guy Sets -Material Cost
16 Item Code : As per Electrical SR 390 1 No --- 390
Item Name : Guy Sets -Labour Cost
17 Item Code : As per Electrical SR 36497 0.5 No --- 18248.5
Item Name : Rabbit ACSR Conductor -Material Cost
18 Item Code : As per Electrical SR 2869 0.5 No --- 1434.5
Item Name : Rabbit ACSR Conductor -Labour Cost
19 Item Code : As per Electrical SR 79 18 No --- 1422
Item Name : PG Clamps for rabbit conductor -Material Cost
20 Item Code : As per Electrical SR 165 15 No --- 2475
Item Name : Spiral earth electrode -Material Cost
21 Item Code : As per Electrical SR 61 15 No --- 915
Item Name : Spiral earth electrode -Labour Cost
22 Item Code : As per Electrical SR 191 15 No --- 2865
Item Name : EG Strirrups with GI Wire Lacing -Material Cost
23 Item Code : As per Electrical SR 109 15 No --- 1635
Item Name : EG Strirrups with GI Wire Lacing -Labour Cost
24 Item Code : As per Electrical SR 174 1 No --- 174
Item Name : Guy concerting with Boulders, mud andsand -Labour Cost
25 Item Code : As per Electrical SR 146 15 No --- 2190
Item Name : Caution/Danger board as per Drawing No Bescome/GM/CP/40/Dt 24.10.07 -Material Cost
26 Item Code : As per Electrical SR 53 15 No --- 795
Item Name : Caution/Danger board as per Drawing No Bescome/GM/CP/40/Dt 24.10.07 -Labour Cost
27 Item Code : As per Electrical SR 76 14 No --- 1064
Item Name : Antu-Climbing Device (12 mtr/1 kg GI Barbed wire) Lumsum -Material Cost
28 Item Code : As per Electrical SR 28 14 No --- 392
Item Name : Antu-Climbing Device (12 mtr/1 kg GI Barbed wire) Lumsum -Labour Cost
29 Item Code : As per Electrical SR 33292.35 1 No --- 33292.35
Item Name : Reaising above @90%
Information on litigation in which the Tenderer is involved:
Other Party/Parties Employer Details of Dispute Amount involved Remarks showing Present Status
BANKER’S CERTIFICATE
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely ……………………………… (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………… to meet the working capital requirements for executing the above contract
Name of the Bank, Senior Bank Manger
Address:…………………………
List of Machinery
Item of Equipment Requirement Owned/ Hired/Leased Owned/ Hired/Lease and available Remarks
No. Capacity Number/Capacity Age/ Condition
Information of the works for which Tenderer has submitted Tender.
Project Name Name & Address of the Employer Name of Work Amount put to Tender in Rs lac. Specified period of completion (including/excluding Monsoon Prescribed last date of submission of tender Probable date of decision on the Tender Remarks if any.
Information of the works for which Tender acceptance letters are received.
Project Name Name & Address of the Employer Name of Work Tendered Amount in Rs lac Specified period of completion (including/excluding Monsoon Probable Date of Handing over of site
Attach letters of Acceptance received.
Information on works which are yet to be completed.
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
Attach Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Monthly Physical and Financial Progress Achieved in all Contracts which are referred to in Format 3
Names of Works Item of Work Names of Employers 2018-19 Remarks (Indicate contract reference)
January February march April May June July August September October November December
Earthwork & Embankment in cum Physical
Base Course (WMM/WBM) in cum Physical
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) in cum Physical
Concrete in cum Physical
Steel in MT Physical
Others Specify Details Physical
Earthwork & Embankment in cum Physical
Base Course (WMM/WBM) in cum Physical
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) in cum Physical
Concrete in cum Physical
Steel in MT Physical
Others Specify Details Physical
Earthwork & Embankment in cum Physical
Base Course (WMM/WBM) in cum Physical
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) in cum Physical
Concrete in cum Physical
Steel in MT Physical
Others Specify Details Physical
Earthwork & Embankment in cum Physical
Base Course (WMM/WBM) in cum Physical
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) in cum Physical
Concrete in cum Physical
Steel in MT Physical
Others Specify Details Physical
Earthwork & Embankment in cum Physical
Base Course (WMM/WBM) in cum Physical
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) in cum Physical
Concrete in cum Physical
Steel in MT Physical
Others Specify Details Physical
Earthwork & Embankment in cum Physical
Base Course (WMM/WBM) in cum Physical
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) in cum Physical
Concrete in cum Physical
Steel in MT Physical
Others Specify Details Physical
FORMAT FOR WORK DONE CERTIFICATE TO BE OBTAINED FROM COMPETENT AUTHORITY
has executed/ is executing(strike off which ever is not applicable) the work of .............................................
in this Organisation. The details of the work is as under:
1 Name of the Project :
2 Name of the Work :
3 Contract Amount :
4 Date of signing the Agreement :
5 Date of handing over of the Site :
Progress * : 2018-19
January February March April May June July August September October November December
Earthwork & Embankment Physical in cum :
Financial in lac :
Base Course (WMM/WBM) Physical in cum :
Financial in lac :
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2019-20
January February March April May June July August September October November December
Earthwork & Embankment Physical in cum :
Financial in lac :
Base Course (WMM/WBM) Physical in cum :
Financial in lac :
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2020-21
January February March April May June July August September October November December
Earthwork & Embankment Physical in cum :
Financial in lac :
Base Course (WMM/WBM) Physical in cum :
Financial in lac :
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2021-22
January February March April May June July August September October November December
Earthwork & Embankment Physical in cum :
Financial in lac :
Base Course (WMM/WBM) Physical in cum :
Financial in lac :
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2022-23
January February March April May June July August September October November December
Earthwork & Embankment Physical in cum :
Financial in lac :
Base Course (WMM/WBM) Physical in cum :
Financial in lac :
Asphalt Quantities (MSS/BM/BC/SDBC/DBM) Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
7 Stipulated Period of Completion (including monsoon)
8 Prescribed Date of completion
9 Actual Date of Completion/ Probable Date of Completion
10 Cost of balance work (if work is in progress) :
11 Reasons if any for delay in completion, if work completion is delayed :
12 Penalty if any imposed :
13 Any other information :
* Monthwise progress shall be furnished seperately.
Date: (Authorised Signatory)
Address for correspondence:
Work executed as prime contractor (in the same name) on works of similar nature during the five years specified)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon Actual date of completion Remarks (appreciation letter received for early completion or reasons, if there is delay in completion)
Attach Workdone Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Financial Year Total value of Civil Engineering works executed and payments received in the last five years (in Rs. lac)
Billed upto date during 2023-24
Attach Chartered Accountant's Yearwise Statements.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
technical specifications.zip
Others - Specification • 0.27 MB
35960-Mile stone.xls
Others - Milestone • 0.36 MB
Road-Bridge Spec doc.zip
Others - Specification • 1.19 MB
Debarment circular.pdf
Others - Govt Circular • 0.74 MB
Circular.pdf
Others - Govt Circular • 2.53 MB
Royalty Order.pdf
Others - Royalty order • 4.03 MB
road work specification.doc
Others - Specification • 2.21 MB
kw4_bid_document_wi_35960.doc
Tender Document • 3.08 MB
loc format.pdf
Others - loc format • 1.73 MB
electrical tech specifications.pdf
Others - Specification • 0.45 MB
Formet 3-4.xls
Others - format • 0.10 MB
Download all tender documents and submit your bid