Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC MUNICIPAL CORPORATION ADITYAPUR NAME OF SCHEME LAYING OF PAVER BLOCK ROAD FROM HOUSE OF SUNIL KARUA TO MANSA MANDIR IN WARD NO 27 UNDER AMC NIT 10 UDD AMC 03 2023 24 ESTIMATED COST 989433 59 | ₹9.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.2 LRejected-AOC RAGHUKUL 37 A 2ND PHASE CROSS ROAD NO 03 ADITYA GARDEN ADITYAPUR | ₹10.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹12.7 LRejected-AOC BOKARO | BOKARO | JHARKHAND | 825102 | ₹12.7 L | L3 | Rejected-AOC L3 |
| 4 | L4₹13.0 LRejected-AOC H NO 1 1 1 ADITYAPUR 2 SARAIKELA KHARASWAN | ADITYAPUR | SARAIKELA KHARASWAN | JHARKHAND | ₹13.0 L | L4 | Rejected-AOC L4 |
Tender Value
₹12.7 L
EMD Value
₹25,500
Closing Date
17 Jan 2026, 4:00 pmClosed
AMC Muncipal Corporation Adityapur
Kalpanapuri Adityapur
Boundary Wall in Jaher Sthal Sarna in Ichhapur at Ward No. 24 under AMC
2026_UDD_108687_66
UDD/AMC/09/2025-26
Open Tender
Civil Works
120 days
Ward No. 24
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹25,500
Yes
27 Mar 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
17 Jan 2026
9 Jan 2026
Earth work in excavation in foundation trenches in ordinary soll (vide classification of soil item A) ...do... do... specification and direction of E/I.[5.1.1+5.1.2]
Providing coarse clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/1.[15.1.10]
Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete. buiniding specifiacation and as per direction of E/I.(5.6.3)
Providing and laying in position cement concrete of grade M-20 with nominal mix (1:1.5:3) excluding the cost of centering and shuttering - All work up to plinth level. [BCD 5.3.1.1]
Providing designation 75B brick work with c.m. (1:6) in foundation ….do…do..E/I.[5.2.6]
Providing designation 75 B Brick work in C.M. (1:6) in superstructure. ..do…. [5.2.14]
Providing and laying in position specified grade of RCC M-20 with nominal mix (1:1.5.3)in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level:[5.3.9.1]
RCC work in walls including attached pilasters, buttresses, plinth and string course, fillets, columns, pillers, piers …... Etc. above plinth level … excluding the cost of centering, shuttering, finishing and reinforcement: [5.3.10]
Providing TMT reinforcement bar ……...do……... do……….E/I.
(i)12 mm dia main bar [5.5.5 b]
(ii)10 mm dia longitudinal bar [5.5.5 a]
(iii) 8 mm dia bar
Supplying, fitting and fixing M.S. grill gate with M.S. grills made of 20x6mm M.S. flats or 16mm. M.S. square bars fitted on 25x25x 6mm. M.S. Angle frame-do- (when steel is not suppiled by the deptt.). [5.5.30]
Plastering of 12 mm thickness with c.m [1:6]…do…do..E/I[5.7.3]
Colour washing two coats over a coat of white wash over new surface -do- [5.8.6]
Earthwork in back filling the trench after laying different types and sizes of pipes..do….do…E/I.[3.3.2]
Disposal of excavated earth in borrow area sor-p-carriage-2.....do...do...direction of E/I ( Add 50% extra for loose volume)
Carriage of Materials
Sand 1Km(K) + 5Km(P)
Cement 5Km(P)
Chips 1Km(K) + 40Km(P)
Bricks 1Km(K) + 14 KM(P)
Reinforcement bar 5Km (P)
Add 18% GST
Adding Labour Cess @ 1%
For Sign board and Photography
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.95 MB
terms_conditions.pdf
Tender Documents • 0.57 MB
BOQ_146870.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid