Loading…
Loading…
Tender Value
₹74.8 L
EMD Value
₹1.5 L
Closing Date
6 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
HQ OFFICE
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less ; where V= Advertised value of the tender in crores of Rupees & N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.(Please refer para 10.2 of tender document)
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.(Please refer para 10.1 of tender document)
**Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
Defination of Similar Work :- Any work of bridge on running lines involving Metallizing or Painting.
8 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For Schedule of Work, Scope of Work, Special Conditions, Methodology etc. please refer tender document.
All the bidders/tenderers must ensure that they are GST compliant and their quoted tax structures / rates are GST Law.
Improvement of structural life of track girder bridge by sandblasting & epoxy painting of Mumbra Creek Bridge No. 38/2, 5th & 6th Line on CSMT-KYN section of Mumbai division.
CR-BR372025-26
CR-BR372025-26
Open
Works - General
6 Months
Mumbai, Maharashtra
₹0
₹1.5 L
6 Mar 2026
11 Feb 2026
20 Feb 2026
7 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 74,80,704.8 | ||
| — | 2660.00 | — | — | ||
| Epoxy painting of steel Girder of Track Girder Bridges/ROBs within 3 m from OHE wire In the Induction area during traffic & power block In day/night hours with priming coat of Epoxy Zinc phosphate primer, Intermediate coat of epoxy micaceous Iron oxide followed by two finishing coats of Polyurethane aluminium with all labours, T&P and material including all lead & lift as a complete Job duly conforming to all relevant specifications and process given under para 218(2) of IRBM. Note- These rates are applicable only for the Induction area as defined in the Item. | — | — | — | 37,39,960 | |
| — | 4013.00 | — | — | ||
| Epoxy painting of steel Girder of Track Girder Bridges/ROBs with priming coat of Epoxy Zinc phosphate primer, intermediate coat of epoxy micaceous iron oxide followed by two finishing coats of Polyurethane aluminum with all labours, T&P and material including all lead & lift as a complete job duly conforming to all relevant specifications and process given under para 218(2)of IRBM. | — | — | — | 36,91,960 | |
| — | 140.00 | — | — | ||
| Shifting of bridge sleeper during traffic block by carrying out all required operation viz. Removing the faster/fittings of existing track structure along with removal of elastomeric /rubber pads etc and restoration in position including fixing of elastomeric /rubber pads with approved quality epoxy material (including safety gear) for structural repairs/painting /metalizing or any other work as directed by Engg. in-charge with all contractor's labour, tools, equipments, consumables etc complete. | — | — | — | 48,784.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
37-MumbraCreekpainting.pdf 37 Mumbra Creek painting
ATTACHMENT
37-MumbraCreekpainting.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .