Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAdmitted-Finance | ₹29.5 L | L1 | Admitted-Finance |
| 2 | L2₹31.6 LAdmitted-Finance R O SHAHI NIWAS UPMOHAL KYARI P O AMBEDKAR CHOWK TUTIKANDI SHIMLA 4 | ₹31.6 L | L2 | Admitted-Finance |
| 3 | L3₹31.9 LAdmitted-Finance NOT AVAILABLE | ₹31.9 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Ramesh Kumar L3 | PALAK SEHGAL L1 | Jibachh Goswami L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 4.46 | P.Cum | 330 ₹1,470.15 | 300 ₹1,336.50 | 310 ₹1,381.05 |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 8.91 | P.Cum | 280 ₹2,494.80 | 250 ₹2,227.50 | 260 ₹2,316.60 |
| 3.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 22.11 | P.Cum | 330 ₹7,296.96 | 300 ₹6,633.60 | 310 ₹6,854.72 |
| 4.00 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 33.75 | P.Cum | 75 ₹2,531.25 | 70 ₹2,362.50 | 75 ₹2,531.25 |
| 5.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 12 | P.Sqm | 110 ₹1,320 | 100 ₹1,200 | 115 ₹1,380 |
| 6.00 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of G.S. Sheet including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 79.3 | P.Sqm | 330 ₹26,169 | 300 ₹23,790 | 310 ₹24,583 |
| 7.00 | Cutting in earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil + Ordinary rock including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 296.67 | P.Cum | 330 ₹97,901.10 | 300 ₹89,001 | 301 ₹89,297.67 |
| 8.00 | Excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of soil + Ordinary rock including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 75 | P.Cum | 330 ₹24,750 | 300 ₹22,500 | 310 ₹23,250 |
| 9.00 | Providing and laying cement concrete 1:4:8 (1 cement :4 sand : 8 graded stone aggregate 40mm nominal size ) excluding cost of centering and shuttering in :- Foundations and plinth including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 6.56 | P.Cum | 4,950 ₹32,472 | 4,800 ₹31,488 | 4,900 ₹32,144 |
| 10.00 | Form wotk :- Centering and shuttering including strutting, propping etc. and removal of form for upto all floor levels Foundations, footings, bases for columns including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 55.44 | P.Sqm | 275 ₹15,246 | 250 ₹13,860 | 275 ₹15,246 |
Tender Value
₹29.1 L
EMD Value
₹58,200
Closing Date
20 Apr 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Construction of Community Center cum Commercial Complex near MC Shops on khasra No 595 to 606 at Mohal Chhotta Shimla SH Site Development Phase I
2026_MC_133991_14
841dated09042026
Open Tender
Civil Works
180 days
SHIMLA
Please refer to tender documents
7 documents required · 7 mandatory
₹1,770
Executive Engineer RB MC Shimla
₹58,200
6 May 2026
10 Apr 2026
21 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 4 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 5 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Sqm | - | - |
| 6 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of G.S. Sheet including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Sqm | - | - |
| 7 | Cutting in earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil + Ordinary rock including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 8 | Excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of soil + Ordinary rock including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 9 | Providing and laying cement concrete 1:4:8 (1 cement :4 sand : 8 graded stone aggregate 40mm nominal size ) excluding cost of centering and shuttering in :- Foundations and plinth including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Cum | - | - |
| 10 | Form wotk :- Centering and shuttering including strutting, propping etc. and removal of form for upto all floor levels Foundations, footings, bases for columns including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | - | P.Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.89 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_198195.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid