| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.1 LAccepted-AOC 1 C NEPAL BHATTACHARJEE STREET KALIGHAT KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | L1 | Accepted-AOC L1 | |
| 2 | L2₹76.5 L+₹40,322.35 (0.53%)Rejected-Finance 17 23 K P ROY LANE KOLKATA 700 031 | KOLKATA | KOLKATA | WEST BENGAL | 700031 | L2 | Rejected-Finance L2 | |
| 3 | L3₹77.3 L+₹1.2 L (1.59%)Rejected-Finance 13 11 MOTILAL GUPTA ROAD KOLKATA 700 008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
22 Aug 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer, Kolkata Electrical Div
The Executive Engineer Kolkata Electrical Division P.W.Dte. BlockI (1st Floor) Writers Buildings, Kolkata 700 001
Temporary Electrical installation work in respect of Durga Puja Idol Immersion Ceremony 2025 at Red Road Part C Electrical Installation Work for both side of the Red Road.
2025_WBPWD_887192_1
WBPWD/EE-KED/eNIQ-21Q/25-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
12 days
Maidan
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.6 L
O/O The Executive Engineer Kolkata Electrical Divi
25 Sept 2025
4 Aug 2025
25 Aug 2025
4 Aug 2025
22 Aug 2025
14 Aug 2025
12 Aug 2025
Amount
Providing a on Hire basis following 415 V TPN MS with rewirable fuse/HRC fuse fixed on angle iron frame incl providing necy inter connection wiring, 2 nos of earthing attachment and dismantling as directed by EIC after the programme.(Upto 5 days)
250 A, TPN MS
400 A, TPN MS
Providing on hire basis 415V, bus bar chamber comprising of 4 nos. copper bars of 500 A capacity, fixed on angle iron frame including necessary interconnection wiring along with termination by socketing the cable/wire ends and 2 nos earthing attachment and dismantling the same after completion of the programme..(with PWD / E.I.C. approved materials)(Upto 5 days)
Providing on hire basis 415V, bus bar chamber comprising of 4 nos. copper bars of 800 A capacity, fixed on angle iron frame including necessary interconnection wiring along with termination by socketing the cable/wire ends and 2 nos earthing attachment and dismantling the same after completion of the programme..(with PWD / E.I.C. approved materials)(Upto 5 days)
Providing and installation on hire basis 500 V , 160Amp MCCB as incomer with 63Amp or 32Amp or 16 Amp per way, 8 Way TPNMCBDB with all arrangement in a outdoor type pillar box incl interconnection with proper socketing and dismantling as direcyted by EIC after the programme(Upto 5 days)
Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing interconnection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials)(Upto 5 days)
240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming (Upto 5days)
Providing on hire basis 500V, 250A on load change over switch on angle iron frame erected on the ground / wall with necessary support incl. interconnection wiring,2 nos earthing attachment socketing,& dismantling the same after completion of the program.(with PWD / E.I.C. approved materials).(Upto 5 days)
Providing on hire basis 500V, 400A on load change over switch on angle iron frame erected on the ground / wall with necessary support incl. interconnection wiring,2 nos earthing attachment socketing,& dismantling the same after completion of the program.(with PWD / E.I.C. approved materials).(Upto 5 days)
Providing and installation on hire basis 500 V, 63Amp/32Amp 4 Pole MCB fixed on sheet metal box with proper socketing and dismantling as directed by EIC after the programme(Upto 5 days)
Supplying & Drawing on Hire Basis following size single core PVC insulated, unsheathed, multistrand 1.1Kv grade, copper/Al wire including necessary termination by socketing the wire ends & dismantling the same after completion of the program.(with PWD / E.I.C. approved materials)(Upto 5 days)
4 X [7/0.064(7/16) Single Core ]
3 X [7/0.036(7/20) single core]
Providing on hire basis main wiring with 1.1 KV grade Aluminium Conductor PVC / XLPE armoured cable of following size including laying in trench (at least 230 mm below ground) including socketing and necessary finishing as required and dismantling the same and mending good the damages.(Upto 5 days)
4C X 6 Sqmm Cu Cable
4C X 16 Sqmm AL cable
4C X 50 Sqmm AL cable
4C X 95 Sqmm AL cable
4C X 185 Sqmm AL cable
Providing and Fixing on hire basis following lights complete with all accessories and dismantling as directed by EIC after the programme(Upto 5 days)
LED Tube light 4ft Box type 40 Watt
20 Watt LED Bulb with holder
9 Watt LED Bulb with holder
Providing and Fixing on hire basis following LED Flood light fittings including clamp and necessary accessories and dismantling as directed by EIC after the programme(Upto 5 days)
Minimum 200 Watt LED Flood fittings.(Crompon/Philips/Bajaj/Nordusk)
Supplying & providing on hire basis full metal body 240V, 600mm dia air-circulator pedestal fan complete with 3 pin 5A plug top, 3 core copper wire cord, body earthing & dismantling the same after completion of the program.(Upto 5 days)
Transportation charge for the materials from Company's godown to Site and return back to godown after use.
Supplying & providing on Hire basis 1 no Seperate 6 amp plug and Switch with 150X100X65mm MS/TW switch Board including necy. wiring in 3 x 1.5 sq mm single core PVC insulated, unsheathed, multistrand copper wire (avg. Length 5 mtr) & dismantling the same after completion of the program.(Upto 5 days)
Supplying & providing on Hire basis 1 no Seperate 20 amp plug and Switch with 150X100X65mm MS/TW switch Board including necy. wiring in 3 x 2.5 sq mm single core PVC insulated, unsheathed, multistrand copper wire (avg. Length 5 mtr) & dismantling the same after completion of the program.(Upto 5 days)
Supply & providing on hire basis Earthing with 50 mm dia GI pipe 2.5 to 3 mtrs long and 6/8 SWG GI wire with galvanized nut and boltss washer etc. below the ground level & dismantling the same(Upto 5 days)
Providing and installation on hire basis min 4 Ton Tower type AC Machine complete with all necy arrangements and dismantling as direcyted by EIC after the programme.(Upto 5 days)
Supply and installation of 8.5 TR Ductable type Air Conditioning machine on hire basis(Upto 5 days)
Ducting as required(Upto 5 days)
Ducting Insulation with nitrile insulation and fixing with adhesive(Upto 5 days)
Diffuser Grill as required (Upto 5 days)
Transportation charge for the materials from Company's godown to Site and return back to godown after use.
Supplying & Providing on hire basis 415V, 3 Phase CPCB approved soundless diesel generator set for prime/standby operation with mobil incl. transportation ,one operator & appropriate size of cable upto 120 Mtrs including necessary interconnection, socketing & dismantling as directed by EIC after the program. If the DGs are not placed at site on time , pro rata rate will be reduced from bill.( For Programme & Rehearsal)
250 KVA-08 Sets (For Each Single Day upto 3 Days)
250 KVA-08 Sets (For Each Single Day more than 3 Days)
125 KVA-14 Sets (For Each Single Day upto 3 Days)
125 KVA-14 Sets (For Each Single Day more than 3 Days)
62.5 KVA-10 Sets(For Each Single Day upto 3 Days)
62.5 KVA-10 Sets( For Each Single Day more than 3 Days)
Charges for making temoporary rain shed for protecting all the above electrical panels, Main switches, DBs, Changeover switches etc from rain water.
Deployment of 15 no. Skilled Electrician,06 No AC Technician & 21 no. Helper per shift per day (i.e. Total 45 nos Electrician,18 nos AC technician & 63 nos Helper per day ) for carring out all kind of EI operation , & proper upkeepment and preventing any unwanted incidents like theft, willful damage etc. (no additional charge will be paid for any unwanted incidents)
18 % GST on the total amount from SL no 1 to 27.
Supply and pouring of HSD for the hired DG set incl. handing cost.(The measurement will be done after considering all technical aspect,orginal invoice & log book)
Special Terms and conditions for Temporary E.I. Work - 1) Earthing should conform to IS specification. Earth Continuity wire should not be broken / Jointed. Single Earth continuity wire should be used from Earth Bus-Bar to the installation. 2) All 3ɸ Electrical Panel Should be earthed by two nos. of separate earthing and 1ɸ panel should be earthed by one no earthing. 3) MCB / Rewirable Fuse type Distrubution Board should be installed with proper Trip Current setting / fuse wires. However, MCB type DBs are preferable. 4) No Part of the Electrical Circuit in the pandal / Structure shall be within 12 inches of any decorative cloth / paper. 5) Ordinary Flexible wires should not be used. Only new PVC insulated & sheathed wires (Bearing ISI mark) or PVC insulated wires of FRLS (Fire Resistant Low Smoke) type (ISI Marked) are allowed. 6) All cable ends should be properly socketed. 7) All joints shall be made with porceline insulated connectors. Twisted & lapped joints shall be avoided. But Joints are strictly not allowed in the dias. 8) Cables / Wires should run along outside the Dias. 9) Ceiling fan (s) / Electrical fittings must not be suspended from the ceiling of Dias. Pedestal fans are not allowed on the Dias. However, Pedestal fans may be installed outside dias, but the body of the fan must be properly earthed.
10) T/L fittings shall be of box type (Indoor commercial type). Any kind of open type fittings must be avoided. 11) Each A.C. Machine should be connected with a separate circuit and earthing should be provided by separate single earth contunuity wire from Earth Bus-bar. 12) P.A. System and Microphone shoud be earthed. 13) Sufficient quantity of Fire Extinguishers and First Aid Box should be provided. 14) If the DGs are not placed at site on time pro rata rate will be reduced from bill. 15) The guarding /security arrangement of all the hired products /installation has to be made by the successful bidder at his/their own cost and responsibility. No additional charge will be paid for any unwanted incidents like theft, damage due to natural calamities or any other reasons whatsoever. 16) During entire hiring period any fault to the hired installation shall be rectified/faulty items replaced, at the cost of agency. Suitable man power for attending and rectification/replacement of damaged items has to be provided by the agency at their own cost. Rectification time is 1 hour for the event day and upto 2hrs for other days. 17) A test certificate cum safety certificate is to be provided by the agency, duly signed by the Supervisor of the agency after completion of installation. 18) A performance guarantee of hired DG sets and AC machines has to be provided by the agency after completion.
ANAMICA ENTERPRISE (BID ID -6860207)
S. K. CHATTERJEE ELECTRICALS PVT LTD (BID ID -6860519)
Bidder Name
SHREE GANESH ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .