Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAccepted-AOC | ₹7.6 Cr | L1 | Accepted-AOC technicallly qualified and quoted lowest amount |
| 2 | L2₹7.7 CrRejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹7.7 Cr | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹7.8 CrRejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹7.8 Cr | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | L4₹8.0 CrRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹8.0 Cr | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 5 | L5₹8.2 CrRejected-Finance 0 272 273 1 | ₹8.2 Cr | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ENTERPRISES L4 | Durga Engineers and Earth Movers L3 | MS TRISHIRA CONSTRUCTION PRIVATE LIMITED L5 | M/S UNITE ENTERPRISES L2 | ARUN CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granlar material including fixing with cement morter 1:2 but excluding excavation, protection works, backfilling concrete and masonry works in head walls and parapets. (1000mm dia) | 121.16 | RM | 6,000 ₹7.3 L | 6,500 ₹7.9 L | 50,000 ₹60.6 L | 7,200 ₹8.7 L | 7,000 ₹8.5 L |
| 2.00 | E/W in road diversion including lead upto 30 meters, lift upto 1.5 metersexcluding mechanical compaction but inclusive of manual compaction and dressing to profile. As per direction of Engg. In charge. | 5,407.98 | CUM | 60 ₹3.2 L | 85 ₹4.6 L | 120 ₹6.5 L | 60 ₹3.2 L | 65 ₹3.5 L |
| 3.00 | Construction of Subgrade with Material Obtained from Available Land (For Local Earth Work)Construction of embankment with approved material obtained from available land as permitted and approved by Engineer-in-charge | 25,080 | CUM | 45 ₹11.3 L | 90 ₹22.6 L | 150 ₹37.6 L | 65 ₹16.3 L | 60 ₹15.0 L |
| 4.00 | Earth work in excavation of foundation in ordinary soil /sand loam, clay or sand including lift up to 1.5 m and lead up to 30m including filling, watering, ramming of excavated earth into the foundation dressing and manual compaction directed by engineer-in-charge. | 1,109.81 | CUM | 90 ₹99,882.90 | 90 ₹99,882.90 | 130 ₹1.4 L | 72 ₹79,906.32 | 80 ₹88,784.80 |
| 5.00 | Design, Drawing, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories as per relevant IS code for operating Head/cross/ escape regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, oiling including applying one coats of zinc chromate red oxide primer excluding three coats of approved synthetic enamel paint etc., complete as per specifications and approved drawing, including packing & forwarding charges for structural steel components and other materials. Work shall be carried out as drawing provided and as per direction of Engineer-in-charge. | 7,995.49 | kg | 95 ₹7.6 L | 110 ₹8.8 L | 190 ₹15.2 L | 92 ₹7.4 L | 80 ₹6.4 L |
| 6.00 | M-150 class brick work in 1:4 cement mortar with cement coarse sand and brick including cost of all labour & materials T&P etc. required for proper completion of the work. Work shall be carried out as drawing provided and as per direction of Engineer-in-charge. total | 173.5 | CUM | 6,000 ₹10.4 L | 5,900 ₹10.2 L | 6,500 ₹11.3 L | 5,845 ₹10.1 L | 5,500 ₹9.5 L |
| 7.00 | M 150 dry brick on end pitching including preparation of sub grade and filling joints with Cement Mortar. Total | 127 | SQM | 1,117 ₹1.4 L | 1,000 ₹1.3 L | 600 ₹76,200 | 945 ₹1.2 L | 1,000 ₹1.3 L |
| 8.00 | Dry Brick on edge Soling including preparation of sub grade and filling joints with local earth./Sqm. Total | 62,700 | SQM | 565 ₹3.5 Cr | 525 ₹3.3 Cr | 610 ₹3.8 Cr | 512 ₹3.2 Cr | 523 ₹3.3 Cr |
| 9.00 | PLASTERING 1:4 Cement & Local sand including all Labour & Material, T&Petc.required for proper completion of work. Work shall be carried out as drawing provided and as per direction of Engineer-in-charge. | 19.2 | SQM | 200 ₹3,840 | 225 ₹4,320 | 400 ₹7,680 | 192 ₹3,686.40 | 180 ₹3,456 |
| 10.00 | CEMENT POINTING 1:2 Cement & Local sand including all Labour & Material, T&Petc.required for proper completion of work. Work shall be carried out as drawing provided and as per direction of Engineer-in-charge. | 462.6 | SQM | 100 ₹46,260 | 125 ₹57,825 | 200 ₹92,520 | 145 ₹67,077 | 120 ₹55,512 |
Tender Value
₹9.8 Cr
EMD Value
₹19.5 L
Closing Date
17 Oct 2025, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
Hardoi khand sharda nahar hardoi ke antargat pihani rajwaha bhadevra shivari utra lilval minor ki kshatigrast pakki sanrachnao ke punarnirman ka karya
2025_UPIDC_1081543_5
03/SE-6/2025-26
Open Tender
Civil Works
450 days
Hardoi
Please refer tender document
2 documents required · 2 mandatory
₹7,354
₹19.5 L
SE Six circle lucknow
16 Feb 2026
10 Oct 2025
17 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
13 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.54 MB
BOQ_1980060.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid